CityIL
Posted
Oct 30, 2026
Nov 24, 2026
Public Safety Center HVAC Replacement RFP
Work will include: replacement of the central plant geothermal system with boiler, chiller, pumps, fan coil units, bas controls and the electrical to support the work.
Description: The project is comprised of replacing and upgrading the existing hvac system. The existing small-capacity split systems will be replaced with new systems utilizing the new a2l refrigerant. Additionally, associated ductwork and piping will be modified for the new equipment.
Library · MO, US
Adjacent opportunities open for bidding right now.
CityIL
Posted
Oct 30, 2026
Nov 24, 2026
Work will include: replacement of the central plant geothermal system with boiler, chiller, pumps, fan coil units, bas controls and the electrical to support the work.
North Muskegon Public School District
School DistrictMI
Posted
-
Dec 4, 2026
North Muskegon Public Schools is seeking proposals to replace HVAC equipment at its schools. The available notice gives no further scope, quantity, or equipment specifications. The attachment name suggests AAON, but the notice does not confirm a manufacturer or model.
School DistrictGA
Posted
Nov 12, 2026
Dec 17, 2026
Chatsworth Elementary School HVAC Replacement Chatsworth, Georgia Bids will be received by the Murray County Board of Education at the Murray County Schools Maintenance and Facilities Office located at 702 Old Dalton Ellijay Road, Chatsworth, GA. 30705. The bids will be publicly opened and read aloud at the Murray County Schools Maintenance and Facilities Office located at 702 Old Dalton Ellijay Road, Chatsworth, GA 30705 on December 17, 2026, at 2:00p.m. LOCAL TIME A mandatory pre-bid conference will be held on December 1, 2026, at 10:00a.m. LOCAL TIME at the Chatsworth Elementary School Building (front office) located at 500 Green Road, Chatsworth, GA. 30705. The pre-bid conference is mandatory in order to submit a bid. Prospective Bidders not attending the Pre-Bid Conference will not be allowed to submit bids on the project. Bidding documents may be obtained electronically through the office of the architect, James W. Buckley and Associates, Attention: Teresa Moore, 114 North Green Street, Swainsboro, Georgia 30401, (478) 237-6467. All bid document request must be emailed to Teresa Moore at tam@jwbuckley.com Additionally, any questions regarding the bid documents or the bid process should be directed to David Holton at djh@jwbuckley.com. The contractor and all subcontractors are required to have registered and be authorized to use Federal Work Authorizations Program ¿Employment Eligibility Verification (EEV)¿ in accordance with Georgia law O.C.G.A. § 13-10-91 ¿Illegal Immigration Reform and Enforcement Act of 2011¿. Contract, if awarded, will be on lump sum basis. No bid may be withdrawn for a period of 35 days after time has been called on the date of opening. Bids must be accompanied by a bid bond and in an amount not less than 5% of the base bid. Both performance bond and a payment bond will be required in an amount equal to 100% of the contract price. The Owner reserves the right to reject any or all bids and to waive technicalities and informalities and to
Higher EducationNC
Posted
-
Dec 2, 2026
Henderson County is soliciting proposals to replace the boiler system in the Sink Building at Blue Ridge Community College. The procurement covers removal of the existing equipment and the supply, installation, and commissioning of new boiler equipment and associated accessories as described in the RFP, engineer drawings, buffer tank selection, and manufacturer product summary. Bidders must follow the specifications and revisions contained in the RFP package and Addendum #1 when preparing their proposals.
Decision makers connected to this RFP from Mid-Continent Public Library.
Solicitation files and supporting documents for this bid.