Summary
Provide all labor, equipment and materials to renovate the MIA TSA breakroom including installation of a new 3 ton, roof mounted, packaged DX air conditioning unit to serve the future TSA breakroom; furnishing and installing associated supply and return ductwork, along with supply and return grills, exposed , as required for proper air distribution within the space; installing a new condensate drainage piping system connected to the rooftop unit. The condensate piping shall be routed horizontally above the roof and AC by newly installed, code-compliant rooftop pipe supports. The new ac unit shall be controlled via a wall-mounted temperature sensor located inside the breakroom.