Work include 964 CY removal of substructures; 2,627 CY unclassified excavation and disposal; 4,892 CY embankment in place; 2,262 CY structure excavation; 138 SY prefabricated composite structural drain; 816 SY seed and mulch - temporary; 445 LF sediment filter log - temporary, 12", type a; 670 LF asphalt pavement joint adhesive; 934 SY miscellaneous cold milling of bituminous concrete; 1,717 LF steel h-piles (hp 12x74); 144 CY footing concrete, performance; 1,416 SY winter surface treatment - superstructure slabs and structural approach slabs.