Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of mechanical and electrical.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide Architectural/MEP/ Structural Services.
Posted Date
Nov 30, 2025
Due Date
Dec 23, 2025
Release: Nov 30, 2025
Close: Dec 23, 2025
Provide Architectural/MEP/ Structural Services.
AvailablePremium
Access the largest public sector contact database
Fayetteville State University (UNC System) solicits bids for the Telecommunication Building MEP project. Bids will be opened on 2025-12-18 at 3:00 pm local time and plans/specifications are available from the designer McKim and Creed.
Posted Date
-
Due Date
Dec 18, 2025
Release: -
Close: Dec 18, 2025
Fayetteville State University (UNC System) solicits bids for the Telecommunication Building MEP project. Bids will be opened on 2025-12-18 at 3:00 pm local time and plans/specifications are available from the designer McKim and Creed.
AvailableFayetteville State University (UNC System) solicits bids for the Telecommunication Building MEP project. Bids will be opened on 2025-12-18 at 3:00 pm local time and plans/specifications are available from the designer McKim and Creed.
Posted Date
-
Due Date
Dec 18, 2025
Release: -
Close: Dec 18, 2025
Fayetteville State University (UNC System) solicits bids for the Telecommunication Building MEP project. Bids will be opened on 2025-12-18 at 3:00 pm local time and plans/specifications are available from the designer McKim and Creed.
AvailableThis project will renovate the food service building and add two building additions consisting of a Lower Level and First Floor. The new south addition will be the location of a new production kitchen on the first floor with the lower level being dedicated to Stores which will include a below grade loading dock. The north addition will be devoted to employee circulation to better allow connection between the staff entry and the lower level locker rooms. Construction of the new addition will allow meal preparation to continue while the building is renovated. All mechanical electrical and plumbing systems will be replaced. Abandoned built-in coolers and freezers will be demolished to allow for better food and material storage. The building envelope will be repaired to preserve the structural integrity of the building. In total the existing building and two new additions will total 47,000 GSF, with the two additions accounting for 9,800 GSF of that total.
Posted Date
Oct 30, 2025
Due Date
Dec 16, 2025
Release: Oct 30, 2025
Close: Dec 16, 2025
This project will renovate the food service building and add two building additions consisting of a Lower Level and First Floor. The new south addition will be the location of a new production kitchen on the first floor with the lower level being dedicated to Stores which will include a below grade loading dock. The north addition will be devoted to employee circulation to better allow connection between the staff entry and the lower level locker rooms. Construction of the new addition will allow meal preparation to continue while the building is renovated. All mechanical electrical and plumbing systems will be replaced. Abandoned built-in coolers and freezers will be demolished to allow for better food and material storage. The building envelope will be repaired to preserve the structural integrity of the building. In total the existing building and two new additions will total 47,000 GSF, with the two additions accounting for 9,800 GSF of that total.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis