Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Fayetteville State University
Fayetteville State University (UNC System) solicits bids for the Telecommunication Building MEP project. Bids will be opened on 2025-12-18 at 3:00 pm local time and plans/specifications are available from the designer McKim and Creed.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Fayetteville State University
Fayetteville State University (UNC System) solicits bids for the Telecommunication Building MEP project. Bids will be opened on 2025-12-18 at 3:00 pm local time and plans/specifications are available from the designer McKim and Creed.
Posted Date
-
Due Date
Dec 18, 2025
Release: -
Fayetteville State University
Close: Dec 18, 2025
Fayetteville State University (UNC System) solicits bids for the Telecommunication Building MEP project. Bids will be opened on 2025-12-18 at 3:00 pm local time and plans/specifications are available from the designer McKim and Creed.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Wisconsin Department of Administration
This project will renovate the food service building and add two building additions consisting of a Lower Level and First Floor. The new south addition will be the location of a new production kitchen on the first floor with the lower level being dedicated to Stores which will include a below grade loading dock. The north addition will be devoted to employee circulation to better allow connection between the staff entry and the lower level locker rooms. Construction of the new addition will allow meal preparation to continue while the building is renovated. All mechanical electrical and plumbing systems will be replaced. Abandoned built-in coolers and freezers will be demolished to allow for better food and material storage. The building envelope will be repaired to preserve the structural integrity of the building. In total the existing building and two new additions will total 47,000 GSF, with the two additions accounting for 9,800 GSF of that total.
Posted Date
Oct 30, 2025
Due Date
Dec 2, 2025
Release: Oct 30, 2025
Wisconsin Department of Administration
Close: Dec 2, 2025
This project will renovate the food service building and add two building additions consisting of a Lower Level and First Floor. The new south addition will be the location of a new production kitchen on the first floor with the lower level being dedicated to Stores which will include a below grade loading dock. The north addition will be devoted to employee circulation to better allow connection between the staff entry and the lower level locker rooms. Construction of the new addition will allow meal preparation to continue while the building is renovated. All mechanical electrical and plumbing systems will be replaced. Abandoned built-in coolers and freezers will be demolished to allow for better food and material storage. The building envelope will be repaired to preserve the structural integrity of the building. In total the existing building and two new additions will total 47,000 GSF, with the two additions accounting for 9,800 GSF of that total.
AvailableCharter Oak Communities
Work includes MEP upgrades.
Posted Date
Oct 15, 2025
Due Date
Dec 3, 2025
Release: Oct 15, 2025
Charter Oak Communities
Close: Dec 3, 2025
Work includes MEP upgrades.
AvailableWisconsin Department of Administration
In general, the work consists of: modernization of five hydraulic elevators in four buildings. The work includes upgrades to HVAC and electrical systems serving the elevators.
Posted Date
Oct 30, 2025
Due Date
Dec 3, 2025
Release: Oct 30, 2025
Wisconsin Department of Administration
Close: Dec 3, 2025
In general, the work consists of: modernization of five hydraulic elevators in four buildings. The work includes upgrades to HVAC and electrical systems serving the elevators.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →