Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of design and build a 38' x 80' storage/maintenance building at the menominee county courthouse complex. The primary purpose of this building will be to store equipment, such as vehicles, boats, a utility tractor & implements, lawnmowers, tools, and other miscellaneous equipment and supplies. The design and construction of the new storage/maintenance building: Dimensions – 38' by 80'; Concrete Slab/Floor – 4"; 12' Side Walls; Gable Roof with 4/12 Pitch; Gable Overhang – 12"; Roofing Material – Architectural Shingle; Exterior Wall Covering – LP Engineered Wood or Equivalent; Interior Wall Covering –5/8" Type X Drywall or Equivalent; Insulated Walls & Ceiling; 10. Two (2) Insulated Service Doors. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
DESIGN-BUILD: Design and construction of a 32' x 65' pole building extension for the city. Components of the construction include: site grading; setting posts on a concrete foundation; concrete floor; wood wall and trusses; steel siding and roofing; doors; and electrical. In addition, the City of Greenville desires to include two rafter-supported garment storage and conveyance systems as an additive alternate to the bid.
Posted Date
Dec 6, 2025
Due Date
Jan 13, 2026
Release: Dec 6, 2025
Close: Jan 13, 2026
DESIGN-BUILD: Design and construction of a 32' x 65' pole building extension for the city. Components of the construction include: site grading; setting posts on a concrete foundation; concrete floor; wood wall and trusses; steel siding and roofing; doors; and electrical. In addition, the City of Greenville desires to include two rafter-supported garment storage and conveyance systems as an additive alternate to the bid.
AvailableDesign/Build-Seeking qualifications for design build services to design and construct a new maintenance of way and office building. The project work tasks shall include, but not be limited to, site development, utility hook-ups, building design and construction to modify main office building and associated components, building design/demolition and construction of new maintenance of way building, mechanical, electrical, plumbing, utility installation and relocation.
Posted Date
Dec 17, 2025
Due Date
Jan 27, 2026
Release: Dec 17, 2025
Close: Jan 27, 2026
Design/Build-Seeking qualifications for design build services to design and construct a new maintenance of way and office building. The project work tasks shall include, but not be limited to, site development, utility hook-ups, building design and construction to modify main office building and associated components, building design/demolition and construction of new maintenance of way building, mechanical, electrical, plumbing, utility installation and relocation.
Design/bid/build project. This will have federal transit administration oversight.
Posted Date
Dec 21, 2025
Due Date
Feb 13, 2026
Release: Dec 21, 2025
Close: Feb 13, 2026
Design/bid/build project. This will have federal transit administration oversight.
AvailableProvide design-build services for the airline terminal project.
Posted Date
Dec 31, 2025
Due Date
Jan 27, 2026
Release: Dec 31, 2025
Close: Jan 27, 2026
Provide design-build services for the airline terminal project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis