Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remove and dispose of the existing 2,000-gal. above ground diesel fuel storage tank with a 1,000-gal. above ground diesel fuel storage tank, reconnect all existing supply lines, and install existing equipment. The tank will be replacing an existing failing tank and will be placed on an existing concrete slab on grade outside to supply diesel fuel for an emergency generator.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Provide General Contractor/Construction Manager (GC/CM) services for the Green Lake Community Center Renovation and New Aquatics Center. This is a phased project that includes preconstruction services and construction of a new aquatics center, replacement of the existing play area and renovation of the existing community center.
Posted Date
Nov 21, 2025
Due Date
Jan 9, 2026
Release: Nov 21, 2025
Close: Jan 9, 2026
Provide General Contractor/Construction Manager (GC/CM) services for the Green Lake Community Center Renovation and New Aquatics Center. This is a phased project that includes preconstruction services and construction of a new aquatics center, replacement of the existing play area and renovation of the existing community center.
AvailableActuator, Electro-Me.
Posted Date
Nov 20, 2025
Due Date
Dec 22, 2025
Release: Nov 20, 2025
Close: Dec 22, 2025
Actuator, Electro-Me.
AvailableWork includes a 2,500-gallon fiberglass reinforced, HDPE or plastic replacement tank for the failing Sludge Holding Tank and associated PVC piping and ball valves for the waste sludge piping, decant and drainage piping, aeration piping and diffusers.
Posted Date
Dec 1, 2025
Due Date
Dec 30, 2025
Release: Dec 1, 2025
Close: Dec 30, 2025
Work includes a 2,500-gallon fiberglass reinforced, HDPE or plastic replacement tank for the failing Sludge Holding Tank and associated PVC piping and ball valves for the waste sludge piping, decant and drainage piping, aeration piping and diffusers.
AvailableThe work consists of replacement of an aboveground 6,000 gallon diesel fuel storage tank, fuel dispensing system, electrical tie-ins, instrumentation and controls, abatement of items containing lead, and other appurtenant work as specified and shown on the drawings. The bidder or installation subcontractor shall have experience furnishing and installing UL 2085 Tanks similar to those required in Section 13200, Diesel Fuel Tank System, and 13850, Fuel Monitoring System.
Posted Date
Nov 5, 2025
Due Date
Dec 18, 2025
Release: Nov 5, 2025
Close: Dec 18, 2025
The work consists of replacement of an aboveground 6,000 gallon diesel fuel storage tank, fuel dispensing system, electrical tie-ins, instrumentation and controls, abatement of items containing lead, and other appurtenant work as specified and shown on the drawings. The bidder or installation subcontractor shall have experience furnishing and installing UL 2085 Tanks similar to those required in Section 13200, Diesel Fuel Tank System, and 13850, Fuel Monitoring System.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis