Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes installation of approx 25,880 SY of 6" reinforced concrete pavement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 9,090 CY of roadway excavation - on-site disposal on stripped (4" minimum depth) and proof-roll tested areas; 3,329 CY of lot manipulation/excavation; 1,000 CY of over excavation (remove and replace soil below the top of subgrade elevation); 5,956 SY of 8" stabilized subgrade preparation (furnish and install, complete in place); 6,831 SY of 6" reinforced concrete pavement; 30 LF of 6", sch-40 pvc irrigation/electrical sleeve; 30 LF of 4", sch-40 pvc irrigation/electrical sleeve; see attached files.
Posted Date
Dec 18, 2025
Due Date
Jan 20, 2026
Release: Dec 18, 2025
Close: Jan 20, 2026
Work includes 9,090 CY of roadway excavation - on-site disposal on stripped (4" minimum depth) and proof-roll tested areas; 3,329 CY of lot manipulation/excavation; 1,000 CY of over excavation (remove and replace soil below the top of subgrade elevation); 5,956 SY of 8" stabilized subgrade preparation (furnish and install, complete in place); 6,831 SY of 6" reinforced concrete pavement; 30 LF of 6", sch-40 pvc irrigation/electrical sleeve; 30 LF of 4", sch-40 pvc irrigation/electrical sleeve; see attached files.
AvailableProcurement of stream debris removal services, including clean-up, demolition, removal, reduction, and disposal of debris from a section of Abbotts Creek.
Posted Date
Dec 22, 2025
Due Date
Jan 21, 2026
Release: Dec 22, 2025
Close: Jan 21, 2026
Procurement of stream debris removal services, including clean-up, demolition, removal, reduction, and disposal of debris from a section of Abbotts Creek.
AvailableThe repair of a section of its levee on arbuckle creek according to financial policy 10. 07. 04. A steel seawall with a steel cap and fdot aluminum picketed handrail is to be installed. The project requires 190 LF of steel sheet pile wall using 40 x z-95 sheet pile. Bids should include the installation of a 16 wide cap with 3 legs welded to the sheet pile wall.
Posted Date
Jan 10, 2026
Due Date
Feb 4, 2026
Release: Jan 10, 2026
Close: Feb 4, 2026
The repair of a section of its levee on arbuckle creek according to financial policy 10. 07. 04. A steel seawall with a steel cap and fdot aluminum picketed handrail is to be installed. The project requires 190 LF of steel sheet pile wall using 40 x z-95 sheet pile. Bids should include the installation of a 16 wide cap with 3 legs welded to the sheet pile wall.
AvailableWork includes clearing and grubbing.
Posted Date
Dec 19, 2025
Due Date
Jan 13, 2026
Release: Dec 19, 2025
Close: Jan 13, 2026
Work includes clearing and grubbing.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis