Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Learning center heating system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Heating system replacement & services.
Posted Date
Jan 7, 2026
Due Date
Feb 12, 2026
Release: Jan 7, 2026
Close: Feb 12, 2026
Heating system replacement & services.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Audiovisual system for the NARDUCCI Learning Center. Supply and install a new control system and DSP: Control Processor (Q-SYS recommended); 7” Touch Panel with tabletop and wall mounting accessories; Managed Network Switch Pre-configured for AVoIP (Netgear M4250 series recommended). See outside link.
Posted Date
Jan 5, 2026
Due Date
Jan 29, 2026
Release: Jan 5, 2026
Close: Jan 29, 2026
Audiovisual system for the NARDUCCI Learning Center. Supply and install a new control system and DSP: Control Processor (Q-SYS recommended); 7” Touch Panel with tabletop and wall mounting accessories; Managed Network Switch Pre-configured for AVoIP (Netgear M4250 series recommended). See outside link.
AvailableAudiovisual system for the NARDUCCI Learning Center. Supply and install a new control system and DSP: Control Processor (Q-SYS recommended); 7” Touch Panel with tabletop and wall mounting accessories; Managed Network Switch Pre-configured for AVoIP (Netgear M4250 series recommended). See outside link.
Posted Date
Jan 5, 2026
Due Date
Jan 29, 2026
Release: Jan 5, 2026
Close: Jan 29, 2026
Audiovisual system for the NARDUCCI Learning Center. Supply and install a new control system and DSP: Control Processor (Q-SYS recommended); 7” Touch Panel with tabletop and wall mounting accessories; Managed Network Switch Pre-configured for AVoIP (Netgear M4250 series recommended). See outside link.
AvailableWork includes replumbing the heating water loop & infrastructure upgrades to the heating hot water & domestic hot water systems. Replacement of gaskets on the grooved piping system throughout the facility.
Posted Date
-
Due Date
Feb 17, 2026
Close: Feb 17, 2026
Work includes replumbing the heating water loop & infrastructure upgrades to the heating hot water & domestic hot water systems. Replacement of gaskets on the grooved piping system throughout the facility.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →