Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Polk County
Supply and deliver master meter radio and cloud read water meters and perform upgrades and maintenance to current software of master meter radio equipment.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Eagle Mountain-Saginaw Independent School District
Provide technology, network, and data management accessories, parts, equipment, and related equipment services.
Posted Date
-
Due Date
Jul 31, 2026
Eagle Mountain-Saginaw Independent School District
Close: Jul 31, 2026
Provide technology, network, and data management accessories, parts, equipment, and related equipment services.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Cleary Water Sewer And Fire Protection District
Construction of 2025 water meter replacement replace all existing water meters aling with meter boxes, meter box tops, and curb stops as necessary. Also includes software and setup, software training, and other incidental items necessary to complete work and have a fully functionable ami meter reading system.
Posted Date
Oct 29, 2025
Due Date
Dec 5, 2025
Release: Oct 29, 2025
Cleary Water Sewer And Fire Protection District
Close: Dec 5, 2025
Construction of 2025 water meter replacement replace all existing water meters aling with meter boxes, meter box tops, and curb stops as necessary. Also includes software and setup, software training, and other incidental items necessary to complete work and have a fully functionable ami meter reading system.
AvailableWayne Community College
Work includes the addition of a master meter, master back flow preventer, and packaged domestic and fire booster pump system and shelter. This addition also includes an extension of approx 250 LF of water main off of wayne community college entrance drive, an addition of nine, 10" isolation valves, installation of a bypass check valve and vault, connection of the packaged booster system to existing power, site/pavement repairs, implementation of required erosion and sediment control measures, installation and maintenance of traffic control, and the connection to existing private water main.
Posted Date
Nov 11, 2025
Due Date
Dec 8, 2025
Release: Nov 11, 2025
Wayne Community College
Close: Dec 8, 2025
Work includes the addition of a master meter, master back flow preventer, and packaged domestic and fire booster pump system and shelter. This addition also includes an extension of approx 250 LF of water main off of wayne community college entrance drive, an addition of nine, 10" isolation valves, installation of a bypass check valve and vault, connection of the packaged booster system to existing power, site/pavement repairs, implementation of required erosion and sediment control measures, installation and maintenance of traffic control, and the connection to existing private water main.
AvailableGrand Rapids Township
Work includes modifying the pipe and valves within the existing master meter chamber to allow for the addition of two reduced pressure backflow prevention devices.
Posted Date
-
Due Date
Dec 10, 2025
Release: -
Grand Rapids Township
Close: Dec 10, 2025
Work includes modifying the pipe and valves within the existing master meter chamber to allow for the addition of two reduced pressure backflow prevention devices.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →