Retrieving RFP details
Release
Close
Cleary Water Sewer And Fire Protection District
Construction of 2025 water meter replacement replace all existing water meters aling with meter boxes, meter box tops, and curb stops as necessary. Also includes software and setup, software training, and other incidental items necessary to complete work and have a fully functionable ami meter reading system.
147-20251021101438 FLORENCE
Borough of Rocky Hill
Water Meter and Equipment Replacement Project The major construction items include approx. 297 units 5/8" x 3/4 " water meter replacement (Borough Supplied Meters); 297 units install/replace meter radio transceiver units (Borough Supplied Radio Transceiver Units); 297 units install/replace meter touch pads (Borough Supplied Meter Touch Pads), and other incidental work appurtenant thereto.
City of Wyoming
Work includes water meter replacement and mxu installation.
Town of Bourne
Remove the existing water meter pit and install a new water meter pit in the designated location in the P-Area and remove and install a new water meter pit in the current location in the C-Area in accordance with the specifications.
Release
Oct 29, 2025
Close
Dec 05, 2025