Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Grand Rapids Township
Work includes modifying the pipe and valves within the existing master meter chamber to allow for the addition of two reduced pressure backflow prevention devices.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Wayne Community College
Work includes the addition of a master meter, master back flow preventer, and packaged domestic and fire booster pump system and shelter. This addition also includes an extension of approx 250 LF of water main off of wayne community college entrance drive, an addition of nine, 10" isolation valves, installation of a bypass check valve and vault, connection of the packaged booster system to existing power, site/pavement repairs, implementation of required erosion and sediment control measures, installation and maintenance of traffic control, and the connection to existing private water main.
Posted Date
Nov 11, 2025
Due Date
Dec 8, 2025
Release: Nov 11, 2025
Wayne Community College
Close: Dec 8, 2025
Work includes the addition of a master meter, master back flow preventer, and packaged domestic and fire booster pump system and shelter. This addition also includes an extension of approx 250 LF of water main off of wayne community college entrance drive, an addition of nine, 10" isolation valves, installation of a bypass check valve and vault, connection of the packaged booster system to existing power, site/pavement repairs, implementation of required erosion and sediment control measures, installation and maintenance of traffic control, and the connection to existing private water main.
AvailableSchenectady County
Grand boulevard pavement preservation & bicycle improvements.
Posted Date
Oct 29, 2025
Due Date
Nov 20, 2025
Release: Oct 29, 2025
Schenectady County
Close: Nov 20, 2025
Grand boulevard pavement preservation & bicycle improvements.
AvailableCity of Middleton
Project consist of 395 LF of 4" HDPE pressure sewer pipe; 673 LF of existing force main cladding and insulation. Provide all labor, equipment and materials for the construction of the Grand View Wastewater System Improvements including treatment lagoons and mechanical upgrades
Posted Date
Oct 22, 2025
Due Date
Nov 19, 2025
Release: Oct 22, 2025
City of Middleton
Close: Nov 19, 2025
Project consist of 395 LF of 4" HDPE pressure sewer pipe; 673 LF of existing force main cladding and insulation. Provide all labor, equipment and materials for the construction of the Grand View Wastewater System Improvements including treatment lagoons and mechanical upgrades
AvailableCity of Grand Ledge
The City of Grand Ledge seeks proposals for updating the 2022-2026 Parks and Recreation Master Plan to cover 2027-2031. The project involves stakeholder engagement, community input activities, and recommendations for park development and accessibility. The consultant must adhere to Michigan Department of Natural Resources guidelines and provide a comprehensive plan ready for City Council action by December 2026.
Posted Date
Nov 12, 2025
Due Date
Dec 2, 2025
Release: Nov 12, 2025
City of Grand Ledge
Close: Dec 2, 2025
The City of Grand Ledge seeks proposals for updating the 2022-2026 Parks and Recreation Master Plan to cover 2027-2031. The project involves stakeholder engagement, community input activities, and recommendations for park development and accessibility. The consultant must adhere to Michigan Department of Natural Resources guidelines and provide a comprehensive plan ready for City Council action by December 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis