Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Wayne Community College
Work includes the addition of a master meter, master back flow preventer, and packaged domestic and fire booster pump system and shelter. This addition also includes an extension of approx 250 LF of water main off of wayne community college entrance drive, an addition of nine, 10" isolation valves, installation of a bypass check valve and vault, connection of the packaged booster system to existing power, site/pavement repairs, implementation of required erosion and sediment control measures, installation and maintenance of traffic control, and the connection to existing private water main.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Truckee Meadows Water Authority
Rehabilitation of two underground booster pump stations. Work includes electrical work and pipe work both inside and outside the vault. In addition to the work at hoge 2 bps, an insertion valve is to be installed on a 14" transite main.
Posted Date
Oct 29, 2025
Due Date
Nov 20, 2025
Release: Oct 29, 2025
Truckee Meadows Water Authority
Close: Nov 20, 2025
Rehabilitation of two underground booster pump stations. Work includes electrical work and pipe work both inside and outside the vault. In addition to the work at hoge 2 bps, an insertion valve is to be installed on a 14" transite main.
AvailableGrand Rapids Township
Work includes modifying the pipe and valves within the existing master meter chamber to allow for the addition of two reduced pressure backflow prevention devices.
Posted Date
-
Due Date
Dec 10, 2025
Release: -
Grand Rapids Township
Close: Dec 10, 2025
Work includes modifying the pipe and valves within the existing master meter chamber to allow for the addition of two reduced pressure backflow prevention devices.
AvailableCity of Middleton
Project consists of the replacement of a weil series 5300 variable speed water pressure booster pump.
Posted Date
Nov 12, 2025
Due Date
Dec 3, 2025
Release: Nov 12, 2025
City of Middleton
Close: Dec 3, 2025
Project consists of the replacement of a weil series 5300 variable speed water pressure booster pump.
AvailableLauderdale County
The Project consists of a new elevated water tower, booster pump station and associated water main piping.
Posted Date
Oct 21, 2025
Due Date
Nov 18, 2025
Release: Oct 21, 2025
Lauderdale County
Close: Nov 18, 2025
The Project consists of a new elevated water tower, booster pump station and associated water main piping.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis