Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consist of 395 LF of 4" HDPE pressure sewer pipe; 673 LF of existing force main cladding and insulation. Provide all labor, equipment and materials for the construction of the Grand View Wastewater System Improvements including treatment lagoons and mechanical upgrades
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes wastewater system improvements.
Posted Date
Dec 16, 2025
Due Date
Jan 20, 2026
Release: Dec 16, 2025
Close: Jan 20, 2026
Work includes wastewater system improvements.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of construction services for Sanitary Sewer System Improvements and Wastewater Treatment Facility Improvements.
Posted Date
Dec 30, 2025
Due Date
Jan 29, 2026
Release: Dec 30, 2025
Close: Jan 29, 2026
Procurement of construction services for Sanitary Sewer System Improvements and Wastewater Treatment Facility Improvements.
AvailableWork includes improvements to the town's existing wastewater treatment plant (wwtp) and collection system, the wwtp work includes but is not limited to conversion of the existing sludge digester to a new sequential batch reactor (sbr) with new diffused aeration equipment, new sbr blowers with vfd's and dissolved oxygen (do) control, backup sbr control system, structural improvements to the existing concrete tanks, conversion of the existing chlorine contact tank to a new uv disinfection tank, new effluent pump station with new force main and outfall structure, the collection system work includes but is not limited to replacing the existing lift station with a new submersible lift station, wet well, valve pit, electrical, controls, cloud-based monitoring system, and replacement of the existing force main.
Posted Date
Dec 10, 2025
Due Date
Feb 17, 2026
Release: Dec 10, 2025
Close: Feb 17, 2026
Work includes improvements to the town's existing wastewater treatment plant (wwtp) and collection system, the wwtp work includes but is not limited to conversion of the existing sludge digester to a new sequential batch reactor (sbr) with new diffused aeration equipment, new sbr blowers with vfd's and dissolved oxygen (do) control, backup sbr control system, structural improvements to the existing concrete tanks, conversion of the existing chlorine contact tank to a new uv disinfection tank, new effluent pump station with new force main and outfall structure, the collection system work includes but is not limited to replacing the existing lift station with a new submersible lift station, wet well, valve pit, electrical, controls, cloud-based monitoring system, and replacement of the existing force main.
AvailableThe Commissioners of Public Works of the City of Charleston (Charleston Water System) is requesting prequalification applications from contractors to provide labor, equipment, and materials for the Windermere Drainage Improvements Project, which includes relocation of water and wastewater utilities in the West Ashley area of Charleston, SC. The solicitation is a Request for Qualifications for contractors to be prequalified to perform construction and utility relocation work. The application deadline is February 3, 2026 at 5:00 PM local time and the opportunity appears active as of 2026-01-18.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
The Commissioners of Public Works of the City of Charleston (Charleston Water System) is requesting prequalification applications from contractors to provide labor, equipment, and materials for the Windermere Drainage Improvements Project, which includes relocation of water and wastewater utilities in the West Ashley area of Charleston, SC. The solicitation is a Request for Qualifications for contractors to be prequalified to perform construction and utility relocation work. The application deadline is February 3, 2026 at 5:00 PM local time and the opportunity appears active as of 2026-01-18.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →