Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Purchase transmission tubular steel poles for the marydia to taft 230KV project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Extend an existing 60 KV overhead transmission line to provide service to a new substation. The substation will be designed and constructed by Others. Extension will consist of two new structures to cut into the existing transmission line and drop into the new substation. The new transmission conductor to be installed for the substation spans is bundled 715 kcmil ACCR "Stilt". The conductor of the existing transmission line is bundled 954 kcmil AAC "Magnolia". Work includes the installation of 2 custom tubular steel monopoles supported on drilled concrete piers.
Posted Date
Nov 24, 2025
Due Date
Jan 8, 2026
Release: Nov 24, 2025
Close: Jan 8, 2026
Extend an existing 60 KV overhead transmission line to provide service to a new substation. The substation will be designed and constructed by Others. Extension will consist of two new structures to cut into the existing transmission line and drop into the new substation. The new transmission conductor to be installed for the substation spans is bundled 715 kcmil ACCR "Stilt". The conductor of the existing transmission line is bundled 954 kcmil AAC "Magnolia". Work includes the installation of 2 custom tubular steel monopoles supported on drilled concrete piers.
Premium
Access the largest public sector contact database
7 EA, pole, SW, 060 FT, H5, 0325 FT-KIPS self-weathering steel pole, 60 feet in length, 0325 ft-kips capacity at groundline (H5 equivalent).
Posted Date
Dec 8, 2025
Due Date
Dec 19, 2025
Release: Dec 8, 2025
Close: Dec 19, 2025
7 EA, pole, SW, 060 FT, H5, 0325 FT-KIPS self-weathering steel pole, 60 feet in length, 0325 ft-kips capacity at groundline (H5 equivalent).
AvailableProvide construction services for JEAs Miller Solar Substation project. The work consists of installing a new 230kV, 3-element ring bus. A prefabricated control enclosure, which will contain preassembled relay panels, and will be installed at site by a third-party vendor described herein (the "Work"). Mobilization, Site Surveying and establish baselines Site Preparation Receive and offload substation packager materials, Install foundations for all structures and equipment, Install ground grid, ground rods, and equipment ground tails, Install conduits/cable trenches, Backfill and compact site as necessary, Install substation rock, Install site access roads, Install security fencing and gates, Transport JEA provided materials and equipment from JEA storeroom, Install 230kV structures, bus, and equipment, Install grounds to structures and equipment, Finish conduit installation, pull cables, and terminate at yard equipment and inside the control house relay equipment Site Clean-up, sodding/seeding and disposal of debris.
Posted Date
Nov 6, 2025
Due Date
Dec 16, 2025
Release: Nov 6, 2025
Close: Dec 16, 2025
Provide construction services for JEAs Miller Solar Substation project. The work consists of installing a new 230kV, 3-element ring bus. A prefabricated control enclosure, which will contain preassembled relay panels, and will be installed at site by a third-party vendor described herein (the "Work"). Mobilization, Site Surveying and establish baselines Site Preparation Receive and offload substation packager materials, Install foundations for all structures and equipment, Install ground grid, ground rods, and equipment ground tails, Install conduits/cable trenches, Backfill and compact site as necessary, Install substation rock, Install site access roads, Install security fencing and gates, Transport JEA provided materials and equipment from JEA storeroom, Install 230kV structures, bus, and equipment, Install grounds to structures and equipment, Finish conduit installation, pull cables, and terminate at yard equipment and inside the control house relay equipment Site Clean-up, sodding/seeding and disposal of debris.
AvailableMontgomery County (Ohio) is requesting Statements of Qualifications (SOQ) for Project No. 130055-06 to expand transmission mains within the Walnut Grove Service Area. SOQs are due by 1:30 pm Eastern on December 17, 2025, and a mandatory Microsoft Teams pre-qualification meeting is scheduled for December 2, 2025.
Posted Date
Nov 7, 2025
Due Date
Dec 17, 2025
Release: Nov 7, 2025
Close: Dec 17, 2025
Montgomery County (Ohio) is requesting Statements of Qualifications (SOQ) for Project No. 130055-06 to expand transmission mains within the Walnut Grove Service Area. SOQs are due by 1:30 pm Eastern on December 17, 2025, and a mandatory Microsoft Teams pre-qualification meeting is scheduled for December 2, 2025.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis