Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Extend an existing 60 KV overhead transmission line to provide service to a new substation. The substation will be designed and constructed by Others. Extension will consist of two new structures to cut into the existing transmission line and drop into the new substation. The new transmission conductor to be installed for the substation spans is bundled 715 kcmil ACCR "Stilt". The conductor of the existing transmission line is bundled 954 kcmil AAC "Magnolia". Work includes the installation of 2 custom tubular steel monopoles supported on drilled concrete piers.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide 3,475 LF of 24” water transmission line, valves, fire hydrants and other miscellaneous items.
Posted Date
Nov 11, 2025
Due Date
Dec 17, 2025
Release: Nov 11, 2025
Close: Dec 17, 2025
Provide 3,475 LF of 24” water transmission line, valves, fire hydrants and other miscellaneous items.
AvailablePremium
Access the largest public sector contact database
Work includes 10 EA utility location excavation, as directed; 625 SY 4" topsoil, seeding, straw, and watering, as directed; 750 LF orange construction fence, as directed; 1 LS sedimentation and erosion controls; 265 LF 12" dr 14 c-900 waterline, installed via open cut; 55 LF 8" dr 14 c-900 waterline, installed via HDD; 30 LF 16" casing pipe bored, complete; 5 EA 6" fire hydrant assembly, complete; 125 LF 1" cellular glass pipe insulation; 1 EA 1" copper service line, long side, complete.
Posted Date
Nov 30, 2025
Due Date
Jan 6, 2026
Release: Nov 30, 2025
Close: Jan 6, 2026
Work includes 10 EA utility location excavation, as directed; 625 SY 4" topsoil, seeding, straw, and watering, as directed; 750 LF orange construction fence, as directed; 1 LS sedimentation and erosion controls; 265 LF 12" dr 14 c-900 waterline, installed via open cut; 55 LF 8" dr 14 c-900 waterline, installed via HDD; 30 LF 16" casing pipe bored, complete; 5 EA 6" fire hydrant assembly, complete; 125 LF 1" cellular glass pipe insulation; 1 EA 1" copper service line, long side, complete.
AvailableConstruction of approx. 17,000 LF of 30" diameter potable water transmission main, to replace an existing transmission main, including fittings, valves, vaults, combination air release valves and low point blow-off and drain assemblies; connections to existing distribution and transmission mains; abandonment of existing water distribution and transmission mains; the transmission main replacement includes two horizontal directional bore and an auger bore casing installation under Hwy 101; approx. 3,600 LF of 12" and 16" diameter potable water distribution line feeding the Port of Tillamook Bay, to replace an existing distribution line, including fittings, valves, vaults, combination air release valves and low point blow-off and drain assemblies; the service line includes pipe installation involving HDD and auger bore techniques; surface restoration, pavement restoration, traffic control and the performance of any other work.
Posted Date
Nov 28, 2025
Due Date
Jan 8, 2026
Release: Nov 28, 2025
Close: Jan 8, 2026
Construction of approx. 17,000 LF of 30" diameter potable water transmission main, to replace an existing transmission main, including fittings, valves, vaults, combination air release valves and low point blow-off and drain assemblies; connections to existing distribution and transmission mains; abandonment of existing water distribution and transmission mains; the transmission main replacement includes two horizontal directional bore and an auger bore casing installation under Hwy 101; approx. 3,600 LF of 12" and 16" diameter potable water distribution line feeding the Port of Tillamook Bay, to replace an existing distribution line, including fittings, valves, vaults, combination air release valves and low point blow-off and drain assemblies; the service line includes pipe installation involving HDD and auger bore techniques; surface restoration, pavement restoration, traffic control and the performance of any other work.
AvailableRelease: Nov 24, 2025
Close: Dec 16, 2025
Sewer extension project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis