Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contractors for the removal of the existing underground fuel oil tank and installation of a new underground fuel oil tank and accessories.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This Request for Proposal (RFP) is for an Oil Tank Removal Project in South Carolina. It was published on November 26, 2025, and bids are due by December 18, 2025. The project involves the removal of oil tanks.
Posted Date
Nov 26, 2025
Due Date
Dec 18, 2025
Release: Nov 26, 2025
Close: Dec 18, 2025
This Request for Proposal (RFP) is for an Oil Tank Removal Project in South Carolina. It was published on November 26, 2025, and bids are due by December 18, 2025. The project involves the removal of oil tanks.
AvailablePremium
Access the largest public sector contact database
Fuel Tank and Island Replacement. Saw cut and break out concrete pad and islands, Evacuate and remove piping and tanks for disposal, current tanks are 10 foot in diameter, Shoring should be supplied due to the depth of the excavation, Fencing around excavation should be supplied, All dirt and pea stone shall be removed offsite and will be the responsibility of the contractor, Furnish and install two (2) 15,000 gallon double walled, fiberglass USTs. Tanks shall be 8-foot diameter.
Posted Date
Nov 24, 2025
Due Date
Jan 6, 2026
Release: Nov 24, 2025
Close: Jan 6, 2026
Fuel Tank and Island Replacement. Saw cut and break out concrete pad and islands, Evacuate and remove piping and tanks for disposal, current tanks are 10 foot in diameter, Shoring should be supplied due to the depth of the excavation, Fencing around excavation should be supplied, All dirt and pea stone shall be removed offsite and will be the responsibility of the contractor, Furnish and install two (2) 15,000 gallon double walled, fiberglass USTs. Tanks shall be 8-foot diameter.
AvailableWork consists of generator replacement project. Provide a full replacement and upgrade the existing primary power distribution (main switchboard). Scope includes decommissioning of the existing emergency generator, selective demolition of unused conductors and conduit, fuel pumps, exhaust pipes, disposal of oil, fuel and any other chemicals.
Posted Date
Aug 22, 2025
Due Date
Jan 9, 2026
Release: Aug 22, 2025
Close: Jan 9, 2026
Work consists of generator replacement project. Provide a full replacement and upgrade the existing primary power distribution (main switchboard). Scope includes decommissioning of the existing emergency generator, selective demolition of unused conductors and conduit, fuel pumps, exhaust pipes, disposal of oil, fuel and any other chemicals.
AvailableProvide fuel supply and delivery services, oil, and additives.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
Close: Dec 18, 2025
Provide fuel supply and delivery services, oil, and additives.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis