StateME
Posted
Nov 2, 2026
Dec 18, 2026
Maine Inland Flood Risk Model
Maine Inland Flood Risk Model
Description: Maine Inland Flood Risk Model
State · ME, US
Decision makers connected to this RFP from State of Maine.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
StateME
Posted
Nov 2, 2026
Dec 18, 2026
Maine Inland Flood Risk Model
New York State Office of General Services
State AgencyNY
Posted
-
Dec 9, 2026
Provide flood risk reduction & restoration, sediment management facility temporary facilities and controls, sediment management facility temporary facilities and controls during winter shutdown, cass park temporary facilities and controls, penninsula temporary facilities and controls, six mile creek temporary facilities and controls, 2,400 SF of stabilized construction entrance; 42,270 SF of drainage and erosion control geotextile and subbase course type 2; 4,725 SF of 18" diameter compost filter sock; 6 EA of storm drain inlet protection; 7,300 TON of dredge debris t&d; 120 TN of vegetation, hydrilla, and organic debris t&d.
Posted
Nov 5, 2026
Dec 7, 2026
The U.S. Army Corps of Engineers, Walla Walla District, is seeking contractor capability information through a sources-sought notice for construction work, rather than a grant program or request for bids. The anticipated project involves flood-risk-management improvements and repairs along upstream and downstream Mill Creek channels in Walla Walla County, Washington. The posting’s Response Date field states December 7, 2026, while its narrative states December 4, 2026, so respondents should clarify the deadline with the contracting office.
FederalDC
Posted
Oct 15, 2026
Dec 11, 2026
Flood management risk and bank. The soldier pile wall would be constructed to a top elevation of 100' NAVD88, and a secondary retaining wall would be constructed to a top elevation of 110' NAVD88. Rip-rap protection would be placed at the toe of the wall to a top elevation of 90' NAVD88.