Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work includes the construction of the following: Removal and disposal of existing lift station pumps, valves, and piping. Furnishing and installing new lift station pumps, valves, and piping. Demolition of existing abandoned lift station structure. Replacement of sluice gate in existing control structure. Bypass pumping as required to accomplish the work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Lift station and force main construction work includes 1,698 LF 4" ASTM D2241 PVC pipe force main, non str backfill; 1,858 LF 4" ASTM D2241 PVC pipe force main, str backfill; 7 EA 4" MJ bend; 1 EA connec to existing manhole; 3,246 LF 2" PVC sch 40 water line; 1 EA water meter and RPZ; see outside link.
Posted Date
Dec 31, 2025
Due Date
Jan 21, 2026
Release: Dec 31, 2025
Close: Jan 21, 2026
Lift station and force main construction work includes 1,698 LF 4" ASTM D2241 PVC pipe force main, non str backfill; 1,858 LF 4" ASTM D2241 PVC pipe force main, str backfill; 7 EA 4" MJ bend; 1 EA connec to existing manhole; 3,246 LF 2" PVC sch 40 water line; 1 EA water meter and RPZ; see outside link.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
Posted Date
Nov 23, 2025
Due Date
Jan 21, 2026
Release: Nov 23, 2025
Close: Jan 21, 2026
Work includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
Available2 EA of Pumps, Lift Station-60P; Parts Lift Station-60P; Spare Parts, Lift Station-60P; Startup Services, Lift Station-60P; Control Panel, Lift Station -60P. 2 EA of Pumps, Lift Station-62P; Parts Lift Station-62P; Spare Parts, Lift Station-62P; Startup Services, Lift Station-62P; Control Panel, Lift Station -62P.
Posted Date
Jan 4, 2026
Due Date
Feb 5, 2026
Release: Jan 4, 2026
Close: Feb 5, 2026
2 EA of Pumps, Lift Station-60P; Parts Lift Station-60P; Spare Parts, Lift Station-60P; Startup Services, Lift Station-60P; Control Panel, Lift Station -60P. 2 EA of Pumps, Lift Station-62P; Parts Lift Station-62P; Spare Parts, Lift Station-62P; Startup Services, Lift Station-62P; Control Panel, Lift Station -62P.
AvailableStation renovation.
Posted Date
Dec 12, 2025
Due Date
Jan 21, 2026
Release: Dec 12, 2025
Close: Jan 21, 2026
Station renovation.