Summary
Upsize water main and gate valves and replace galvanized iron and asbestos cement pipes with new PVC water main. Abandon existing water main in place. At NMDOT crossings, cut, pressure grout, and cap. 500 LF of new 4" PVC water main including fittings and 8 gate valves and boxes 34,700 LF of new 6" PVC water main including fittings and 118 gate valves and boxes 17,200 LF of new 8" PVC water main including fittings and 50 gate valves and boxes 700 LF of new 10" PVC water main including fittings and 2 gate valves and boxes Install 2 altitude valves including bypass and vault Install 41 new fire hydrant assemblies and nine (9) new 2" flush hydrant assemblies Replace 28 existing fire hydrant assemblies and five (5) 2" flush hydrant assemblies.