Project consists of removal of existing asphalt pavement, concrete pavement, sidewalk, curb and gutter, stormwater structures, trees, and pedestrian light poles, along with associated appurtenances. Work includes removal of approx., 3,600 SY of asphalt pavement, 5,300 SY of concrete pavement, 14 storm inlets, 9 trees, and 18 pedestrian light poles. Additional improvements include installation of 17 ea type II curb inlets, 7 ea type IV curb inlets, 1 ea type B curb inlet, 6 ea 48" storm manholes, and 3 connections to an existing storm main. Installation includes approx., 1,004 LF of 10" PVC SDR-35 and 352 LF of 10" PVC C900 storm pipe. Construction includes approx., 815 tons of asphalt patch, 2,908 LF of curb and gutter, 24,330 SF of 4" concrete sidewalk, 4,137 SF of 6" concrete driveway apron, 1,309 SY of alley concrete pavement, and 1,944 SF of ADA ramps. Work also includes 8 ea sign replacements (direct embedded base), 18 ea sign replacements (slip base), 2 ea rectangular rapid flashing beacons, 10 ea concrete parking bumpers, 14 landscape islands, and miscellaneous striping. Electrical improvements include installation of 52 pedestrian light poles with foundations and luminaires, 14 handholes, and 2 electrical meter mains. Work also includes installation of underground conduit and wiring systems, including approximately 1,390 LF of horizontal directional drilling and associated trenching and backfill for conduit installation. The project also includes a bid alternate consisting of approximately 29 SY of asphalt removal, 239 SY of concrete removal, 7 tons of asphalt patch, 129 LF of curb and gutter, 1,329 SF of 4" concrete sidewalk, and 1 ea sign replacement (direct embedded base), along with associated traffic control and striping, which may be awarded at the owner’s discretion based on available funding.