City of Auburn
Asphaltic concrete milling, deep patching (as directed), excavation of unsuitable material as needed, replacement, grading, compaction of grade aggregate base course as needed, patching, asphalt overlay of the rehabilitated area with 1 1/2" of 9.5 mm Superpave, installation or replacement of thermoplastic striping as directed, replacement of 130 LF of concrete sidewalk, traffic control, erosion control, and dust control.
Release
Aug 21, 2024
Close
Sep 19, 2024