Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Medium voltage and telecommunications ductbank, cabling, and equipment install and demolition.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide maintenance and repair of medium voltage electrical switchgear.
Posted Date
Dec 1, 2025
Due Date
Jan 13, 2026
Release: Dec 1, 2025
Close: Jan 13, 2026
Provide maintenance and repair of medium voltage electrical switchgear.
AvailablePremium
Access the largest public sector contact database
The Lot C-1 Water and Sewer Extension project involves installing a new water line and all appurtenances from Perimeter Road to Cherry Road through the C-1 parking lot. The project is being managed by Clemson University, and the construction cost range is estimated to be between $850,000 and $995,000. The project delivery method is design-bid-build.
Posted Date
Dec 4, 2025
Due Date
Jan 27, 2026
Release: Dec 4, 2025
Close: Jan 27, 2026
The Lot C-1 Water and Sewer Extension project involves installing a new water line and all appurtenances from Perimeter Road to Cherry Road through the C-1 parking lot. The project is being managed by Clemson University, and the construction cost range is estimated to be between $850,000 and $995,000. The project delivery method is design-bid-build.
AvailableReplace medium voltage transformer cutoff switches.
Posted Date
Dec 1, 2025
Due Date
Dec 17, 2025
Release: Dec 1, 2025
Close: Dec 17, 2025
Replace medium voltage transformer cutoff switches.
AvailableProvide urgent, on-call as needed electrical low -voltage (600 volts and below) services for the buildings identified in exhibit a, attachment 1, service locations. Services shall include the following: evaluate and diagnose, repair and replace, test and inspect, report of findings.
Posted Date
Dec 1, 2025
Due Date
Jan 7, 2026
Release: Dec 1, 2025
Close: Jan 7, 2026
Provide urgent, on-call as needed electrical low -voltage (600 volts and below) services for the buildings identified in exhibit a, attachment 1, service locations. Services shall include the following: evaluate and diagnose, repair and replace, test and inspect, report of findings.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis