Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Works include approx. 22 LF of Epoxy coated rebar embedded in compacted roadbase leveling course; 980 SF CMU block MSE retaining wall; 980 SF Shotcrete retaining wall facing with color and pattern; 225 LF of Guardrail; 20 TN Asphalt replacement at top and base of wall. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Dec 1, 2025
Close: Dec 30, 2025
Retaining Wall Project.
AvailablePremium
Access the largest public sector contact database
The City of Boston, through the Mayor’s Office of Housing and Public Facilities Commission, invites sealed bids for partial demolition and replacement of a retaining wall at Parker Terrace in Roxbury, MA. Bids are due by December 18, 2025 at 12:00 PM EST, with a mandatory bidders’ conference on December 3, 2025.
Posted Date
Nov 17, 2025
Due Date
Dec 18, 2025
Release: Nov 17, 2025
Close: Dec 18, 2025
The City of Boston, through the Mayor’s Office of Housing and Public Facilities Commission, invites sealed bids for partial demolition and replacement of a retaining wall at Parker Terrace in Roxbury, MA. Bids are due by December 18, 2025 at 12:00 PM EST, with a mandatory bidders’ conference on December 3, 2025.
AvailableThe project involves removing an existing stone retaining wall and disposing off-site, constructing a new retaining wall, clearing and grubbing, earth excavation, grading, providing grass to all disturbed areas, installing soil and erosion control measures, and maintenance and protection of traffic. See attached files.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
The project involves removing an existing stone retaining wall and disposing off-site, constructing a new retaining wall, clearing and grubbing, earth excavation, grading, providing grass to all disturbed areas, installing soil and erosion control measures, and maintenance and protection of traffic. See attached files.
AvailableProject include 1 LS clearing and grubbing; 16 CY roadway excavation (f); 705 SF remove concrete (curb & gutter, sidewalk) (f); 2 TN hot mix asphalt (type a); 141 LF minor concrete (type "a" curb & gutter); 17 EA minor concrete (sidewalk underdrain); 125 LF minor concrete (valley gutter); 635 SF minor concrete (type "a" sidewalk); 1 EA adjust utility cover to grade (revocable); 141 LF red curb (paint, 2 coat); 2,033 SF soil nail wall design-build.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
Project include 1 LS clearing and grubbing; 16 CY roadway excavation (f); 705 SF remove concrete (curb & gutter, sidewalk) (f); 2 TN hot mix asphalt (type a); 141 LF minor concrete (type "a" curb & gutter); 17 EA minor concrete (sidewalk underdrain); 125 LF minor concrete (valley gutter); 635 SF minor concrete (type "a" sidewalk); 1 EA adjust utility cover to grade (revocable); 141 LF red curb (paint, 2 coat); 2,033 SF soil nail wall design-build.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis