Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes: demolition of the combined sewer outfall and block headwall; expansion of the diversion structure, including new cast-in-place structures, bending weirs, mechanical bar screen, manual bar rack, stainless steel slide gates, monitoring and sampling equipment, and electrical appurtenances. Construction of the eq tank and gate vault, include per-stressed concrete tanks, cast in-place gate vault, stainless steel slide gates and interconnecting di pipe. Installation of 48" sewer pipe from the newly expanded structure to the eq vault. Installation of 20" and 24" sewer pipe from eq vault to existing manhole. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
General/Mechanical, Plumbing, and HVAC construction of sewage pumping facilities and appurtenances; generally consists of Electrical construction of sewage pumping facilities and appurtenances; generally consists of construction of force main sewers, gravity sewers, and appurtenances.
Posted Date
Dec 22, 2025
Due Date
Feb 5, 2026
Release: Dec 22, 2025
Close: Feb 5, 2026
General/Mechanical, Plumbing, and HVAC construction of sewage pumping facilities and appurtenances; generally consists of Electrical construction of sewage pumping facilities and appurtenances; generally consists of construction of force main sewers, gravity sewers, and appurtenances.
Availablecombined sewer overflow Facilities Improvements - Screening and Disinfection Facility (SDF) - Disinfection, Screening and Misc. Improvements: Chemical feed, storage and mixing system improvements, Screen system improvements, Select HVAC system improvements, Electrical power, lighting and building systems, Instrumentation and controls, Access hatches, CSO Facility Safety Improvements and Building Rehabilitation, Address the safety and architectural deficiencies identified as part of the “CS-299 Multidisciplinary Needs Assessment” for all nine CSO facilities. Control System Upgrades at Creek and CSO Facilities: Implementation of a series of lighting and instrumentation and control (I&C) system improvements needed at GLWA’s Belle Isle CSO and Baby Creek SDF facilities
Posted Date
Nov 21, 2025
Due Date
Jan 6, 2026
Release: Nov 21, 2025
Close: Jan 6, 2026
combined sewer overflow Facilities Improvements - Screening and Disinfection Facility (SDF) - Disinfection, Screening and Misc. Improvements: Chemical feed, storage and mixing system improvements, Screen system improvements, Select HVAC system improvements, Electrical power, lighting and building systems, Instrumentation and controls, Access hatches, CSO Facility Safety Improvements and Building Rehabilitation, Address the safety and architectural deficiencies identified as part of the “CS-299 Multidisciplinary Needs Assessment” for all nine CSO facilities. Control System Upgrades at Creek and CSO Facilities: Implementation of a series of lighting and instrumentation and control (I&C) system improvements needed at GLWA’s Belle Isle CSO and Baby Creek SDF facilities
Work consists of water systems improvements - phase 3.
Posted Date
Nov 20, 2025
Due Date
Jan 29, 2026
Release: Nov 20, 2025
Close: Jan 29, 2026
Work consists of water systems improvements - phase 3.
AvailableThe Great Lakes Water Authority (GLWA) issued this RFB seeking qualified vendors to perform CSO Facilities Improvements II, which includes installation of a complete communications cable plant (voice, data, AV, security and low-voltage systems) at Harris Health System facilities in Houston, Texas. The scope includes Category 6A horizontal cabling, grounding and bonding, coordination with electrical contractors, equipment room fittings, and compliance with applicable NEC/NFPA/ANSI standards.
Posted Date
-
Due Date
Jan 6, 2026
Release: -
Close: Jan 6, 2026
The Great Lakes Water Authority (GLWA) issued this RFB seeking qualified vendors to perform CSO Facilities Improvements II, which includes installation of a complete communications cable plant (voice, data, AV, security and low-voltage systems) at Harris Health System facilities in Houston, Texas. The scope includes Category 6A horizontal cabling, grounding and bonding, coordination with electrical contractors, equipment room fittings, and compliance with applicable NEC/NFPA/ANSI standards.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis