Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of locker replacement, water cooler replacement. Replacement of elementary wing lockers, replacement of water coolers with new electric water coolers to comply with Michigan filter first legislation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Buckley Community Schools is seeking proposals for the replacement of elementary wing lockers and installation of electric water coolers. The contractor will be responsible for furnishing all materials, labor, equipment, and services necessary for the construction project. This includes replacing elementary wing lockers and water coolers with new electric water coolers that comply with Michigan Filter First legislation.
Posted Date
Dec 23, 2025
Due Date
Jan 20, 2026
Release: Dec 23, 2025
Close: Jan 20, 2026
Buckley Community Schools is seeking proposals for the replacement of elementary wing lockers and installation of electric water coolers. The contractor will be responsible for furnishing all materials, labor, equipment, and services necessary for the construction project. This includes replacing elementary wing lockers and water coolers with new electric water coolers that comply with Michigan Filter First legislation.
AvailableCooler/ Freezer Replacement.
Posted Date
Dec 18, 2025
Due Date
Jan 22, 2026
Release: Dec 18, 2025
Close: Jan 22, 2026
Cooler/ Freezer Replacement.
Available3 EA Water cooler: Quench Q3FS bottleless, black, hot and cold at city hall sales booth B line provide water cooler. See attached file.
Posted Date
Dec 18, 2025
Due Date
Jan 9, 2026
Release: Dec 18, 2025
Close: Jan 9, 2026
3 EA Water cooler: Quench Q3FS bottleless, black, hot and cold at city hall sales booth B line provide water cooler. See attached file.
The project consists of but is not limited to: replacing the existing dry cooler system on the roof to include the dry cooler, pump package, expansion tank, and piping. A new dry cooler, pump package, expansion tank, valves, and piping will be installed. New insulation with jacketing will be included. Electrical work includes demolition of existing power distribution to old equipment and installing new power to equipment. Dry cooler control wiring removal and replacement shall be included.
Posted Date
Dec 9, 2025
Due Date
Jan 13, 2026
Release: Dec 9, 2025
Close: Jan 13, 2026
The project consists of but is not limited to: replacing the existing dry cooler system on the roof to include the dry cooler, pump package, expansion tank, and piping. A new dry cooler, pump package, expansion tank, valves, and piping will be installed. New insulation with jacketing will be included. Electrical work includes demolition of existing power distribution to old equipment and installing new power to equipment. Dry cooler control wiring removal and replacement shall be included.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis