Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Ohio Department of Rehabilitation and Corrections (DRC) issued a quick-quote solicitation to troubleshoot and possibly repair loss of control of the south line reclosure from remote switches on 13kVA switchgear and to restore non-functioning indicator lamps at the LOCI powerhouse. Bidders must submit responses through the OhioBuys portal and inquiries are due by December 30, 2025. The solicitation is open as of 2025-12-20 and closes in January 2026 (deadline listed as Jan 12–13, 2026 in source postings).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Open source software: MOOSE: the multiphysics simulation powerhouse.
Posted Date
Mar 15, 2024
Due Date
Mar 15, 2028
Release: Mar 15, 2024
Close: Mar 15, 2028
Open source software: MOOSE: the multiphysics simulation powerhouse.
AvailablePerform several tasks required to meet the relicensing requirements set by the Federal Energy Regulatory Commission (FERC) for the Lockport Powerhouse (LPH).
Posted Date
Dec 3, 2025
Due Date
Jan 30, 2026
Release: Dec 3, 2025
Close: Jan 30, 2026
Perform several tasks required to meet the relicensing requirements set by the Federal Energy Regulatory Commission (FERC) for the Lockport Powerhouse (LPH).
AvailableProvide powerhouse 1 and 2 DC panel board replacement. This project involves the comprehensive replacement of specified electrical equipment across Powerhouse 1 and Powerhouse 2. The base scope for Powerhouse 1 includes the Main 125V DC Station Board, the Preferred AC Panel, and the Emergency Lighting Panel along with its associated Emergency Lighting Panel Transfer Switch. See attached file.
Posted Date
Nov 12, 2025
Due Date
Jan 16, 2026
Release: Nov 12, 2025
Close: Jan 16, 2026
Provide powerhouse 1 and 2 DC panel board replacement. This project involves the comprehensive replacement of specified electrical equipment across Powerhouse 1 and Powerhouse 2. The base scope for Powerhouse 1 includes the Main 125V DC Station Board, the Preferred AC Panel, and the Emergency Lighting Panel along with its associated Emergency Lighting Panel Transfer Switch. See attached file.
The U.S. Army Corps of Engineers (USACE) - Tulsa District issued Sources Sought A038461 for a turnkey Design-Build contract to replace the existing built-up roof on the Ft. Gibson Powerhouse with a new 2-ply Modified Bituminous Membrane roofing system, including new roof drainage and optional guard rails and roof ladders. The contractor is expected to provide all design, investigation, materials, labor, equipment, and management required to complete the project. The opportunity was posted Dec 9, 2025 and is due Jan 9, 2026; the source listed is SAM.gov and the PIEE solicitation module link is provided for vendor access.
Posted Date
Dec 9, 2025
Due Date
Jan 9, 2026
Release: Dec 9, 2025
Close: Jan 9, 2026
The U.S. Army Corps of Engineers (USACE) - Tulsa District issued Sources Sought A038461 for a turnkey Design-Build contract to replace the existing built-up roof on the Ft. Gibson Powerhouse with a new 2-ply Modified Bituminous Membrane roofing system, including new roof drainage and optional guard rails and roof ladders. The contractor is expected to provide all design, investigation, materials, labor, equipment, and management required to complete the project. The opportunity was posted Dec 9, 2025 and is due Jan 9, 2026; the source listed is SAM.gov and the PIEE solicitation module link is provided for vendor access.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis