Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Water system improvements - water plant 2 - high service pump station improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Water treatment plant improvements including, but not limited to, the construction of a second clear well, complete filter reconstruction, electrical system upgrades, a new backwash waste sump and pump station, repurposing the existing high service pump station, a new high service pumpstation and chemical building, existing chemical feed system improvements, sludge handling/processing improvements, stormwater system updates, and miscellaneous civil/site improvements.
Posted Date
Nov 6, 2025
Due Date
Jan 8, 2026
Release: Nov 6, 2025
Close: Jan 8, 2026
Water treatment plant improvements including, but not limited to, the construction of a second clear well, complete filter reconstruction, electrical system upgrades, a new backwash waste sump and pump station, repurposing the existing high service pump station, a new high service pumpstation and chemical building, existing chemical feed system improvements, sludge handling/processing improvements, stormwater system updates, and miscellaneous civil/site improvements.
Premium
Access the largest public sector contact database
Procurement for the construction and installation of Raw Water Intake Pump Station Improvements 2025, including replacement of a butterfly valve, gate actuator, submerged coarse bar screen, addition of a screen deflector unit, associated electrical work, and temporary bypass pumping.
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
Procurement for the construction and installation of Raw Water Intake Pump Station Improvements 2025, including replacement of a butterfly valve, gate actuator, submerged coarse bar screen, addition of a screen deflector unit, associated electrical work, and temporary bypass pumping.
AvailableWater system improvements including recoating and restoration of the interior and exterior of the existing 300,000-gallon ground storage tank and appurtenances. Replacement of two (2) existing high service pumps and all valves, piping, electrical and associated appurtenances at the pump station. Upsize of approx. 700 LF of existing 10" waterline to 12" water line and all valves and associated appurtenances.
Posted Date
Nov 17, 2025
Due Date
Dec 19, 2025
Release: Nov 17, 2025
Close: Dec 19, 2025
Water system improvements including recoating and restoration of the interior and exterior of the existing 300,000-gallon ground storage tank and appurtenances. Replacement of two (2) existing high service pumps and all valves, piping, electrical and associated appurtenances at the pump station. Upsize of approx. 700 LF of existing 10" waterline to 12" water line and all valves and associated appurtenances.
Work includes ultrasonic master meter, 20 hp booster pump skid, booster pump building enclosure installation, booster pump station installation.
Posted Date
Dec 16, 2025
Due Date
Jan 8, 2026
Release: Dec 16, 2025
Close: Jan 8, 2026
Work includes ultrasonic master meter, 20 hp booster pump skid, booster pump building enclosure installation, booster pump station installation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis