Summary
Hatfield Township (Montgomery County, PA) is soliciting bids for the Line Lexington Road Drainage Project to remove an existing stormwater pipe and install 244 linear feet of 18-inch HDPE pipe, two inlet boxes, a cast-in-place endwall, rip-rap, grading, erosion and sedimentation controls, and related restoration work. The procurement is an IFB (fixed-fee contract) with contract documents prepared by ARRO Consulting / CKS Engineers and a period of performance tied to a 60-calendar-day completion after Notice to Proceed (project schedule references completion by June 2026). Bidders must submit via the buyer's PennBid portal, include a bid security (10% bid bond or equivalent), comply with Pennsylvania prevailing wage and related statutory requirements, and acknowledge addenda as required in the contract documents.