Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
HVAC renovation. Work includes plumbing and electrical.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
HVAC Renovations
Posted Date
Oct 27, 2025
Due Date
Jan 6, 2026
Release: Oct 27, 2025
Close: Jan 6, 2026
HVAC Renovations
AvailablePremium
Access the largest public sector contact database
Elementary School HVAC Renovations. Replacement of (5) Rooftop Heat Recovery Units with Dedicated Outside Air System that is an air cooled, DX Rooftop Unit with hot gas reheat, with an energy recovery wheel, and natural gas fired furnace for heating. Re-use existing ductwork. Replace Library RTU with air cooled DX Rooftop unit with hot gas reheat to address humidity, energy recovery wheel as needed per energy code, and natural gas fired furnace for heating. Re-use existing ductwork. All new RTUs to be air cooled DX with hot gas reheat, energy recovery (as needed per code), with natural gas fired furnace for heating.
Posted Date
Oct 3, 2025
Due Date
Dec 17, 2025
Release: Oct 3, 2025
Close: Dec 17, 2025
Elementary School HVAC Renovations. Replacement of (5) Rooftop Heat Recovery Units with Dedicated Outside Air System that is an air cooled, DX Rooftop Unit with hot gas reheat, with an energy recovery wheel, and natural gas fired furnace for heating. Re-use existing ductwork. Replace Library RTU with air cooled DX Rooftop unit with hot gas reheat to address humidity, energy recovery wheel as needed per energy code, and natural gas fired furnace for heating. Re-use existing ductwork. All new RTUs to be air cooled DX with hot gas reheat, energy recovery (as needed per code), with natural gas fired furnace for heating.
AvailableProject consists of high school additions and renovations. See outside link.
Posted Date
Dec 1, 2025
Due Date
Dec 23, 2025
Release: Dec 1, 2025
Close: Dec 23, 2025
Project consists of high school additions and renovations. See outside link.
AvailableCategory 2 network equipment.
Posted Date
Nov 10, 2025
Due Date
Dec 29, 2025
Release: Nov 10, 2025
Close: Dec 29, 2025
Category 2 network equipment.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis