Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking professional engineering services for the rehabilitation of an existing wastewater lift station.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This RFP is for the rehabilitation of the Wall & Avenue C Lift Station, including civil, electrical, mechanical, and site improvements.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
This RFP is for the rehabilitation of the Wall & Avenue C Lift Station, including civil, electrical, mechanical, and site improvements.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Lift station rehabilitation work includes construct a 20' x 14' pre-fabricated concrete control building; furnish and install new electrical and controls; install a new 8' chain link fence; remove and replace the existing submersible pumps; see outside link.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Lift station rehabilitation work includes construct a 20' x 14' pre-fabricated concrete control building; furnish and install new electrical and controls; install a new 8' chain link fence; remove and replace the existing submersible pumps; see outside link.
The work consist of approx 334 LF 8' chain link fence including 16' and 10' cantilever gates; 1 LS construct a 20' x 14' pre-fabricated concrete control building; 1 LS remove all existing electrical and controls inside and outside of the Wall & Avenue C lift station including underground service, service equipment, MCC, VFD, transfer switch, standby generator receptacle, duct banks, conduit, conductors, and glass enclosure; 1 LS remove and replace the existing submersible pumps including rail system, and appurtenances; 1 LS replace the existing piping inside the wet well including all piping, fittings; 1 LS coat the interior of the wet well including pressure washing, cleaning and disposal of all debris and sludge, and humidity control.
Posted Date
Mar 6, 2025
Due Date
Jan 29, 2026
Release: Mar 6, 2025
Close: Jan 29, 2026
The work consist of approx 334 LF 8' chain link fence including 16' and 10' cantilever gates; 1 LS construct a 20' x 14' pre-fabricated concrete control building; 1 LS remove all existing electrical and controls inside and outside of the Wall & Avenue C lift station including underground service, service equipment, MCC, VFD, transfer switch, standby generator receptacle, duct banks, conduit, conductors, and glass enclosure; 1 LS remove and replace the existing submersible pumps including rail system, and appurtenances; 1 LS replace the existing piping inside the wet well including all piping, fittings; 1 LS coat the interior of the wet well including pressure washing, cleaning and disposal of all debris and sludge, and humidity control.
The City of Haines City (Florida) issued an RFQ seeking qualified engineering firms to provide engineering services for replacement of Lift Station No. 1, including construction, sewer and storm drain work and related wastewater and water system upgrades. The solicitation is an RFQ for professional services and includes a bid document listed on the official posting; there is no pre-bid meeting (non-mandatory) and the opportunity is managed through the city's procurement distribution on DemandStar. Proposals are due by the stated due date and the opportunity is not a grant.
Posted Date
Dec 29, 2025
Due Date
Jan 27, 2026
Release: Dec 29, 2025
Close: Jan 27, 2026
The City of Haines City (Florida) issued an RFQ seeking qualified engineering firms to provide engineering services for replacement of Lift Station No. 1, including construction, sewer and storm drain work and related wastewater and water system upgrades. The solicitation is an RFQ for professional services and includes a bid document listed on the official posting; there is no pre-bid meeting (non-mandatory) and the opportunity is managed through the city's procurement distribution on DemandStar. Proposals are due by the stated due date and the opportunity is not a grant.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →