Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement for the second phase of remodeling for the Light Rail Training Center, encompassing interior and exterior renovations, including additional restrooms, training rooms, exits, support spaces, windows, finishes, façade repair, parking lot additions, stormwater updates, sidewalk modifications, HVAC system extension, power, data, life safety system extensions, and contaminated soil removal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Metropolitan Council is soliciting bids for the Light Rail Training Center Renovation Phase II (Rebid), Project No. 64107. Scope includes interior and exterior remodeling, added restrooms and training spaces, HVAC/power/data/life-safety extensions, contaminated soil removal, façade repair, parking and stormwater updates; the MCUB participation goal is 14%. Bidders must register as plan holders and submit bids electronically through QuestCDN (eBidDoc™ Project 10003728); a pre-bid meeting (Teams) and site visit are scheduled in January 2026.
Posted Date
Dec 23, 2025
Due Date
Jan 29, 2026
Release: Dec 23, 2025
Close: Jan 29, 2026
The Metropolitan Council is soliciting bids for the Light Rail Training Center Renovation Phase II (Rebid), Project No. 64107. Scope includes interior and exterior remodeling, added restrooms and training spaces, HVAC/power/data/life-safety extensions, contaminated soil removal, façade repair, parking and stormwater updates; the MCUB participation goal is 14%. Bidders must register as plan holders and submit bids electronically through QuestCDN (eBidDoc™ Project 10003728); a pre-bid meeting (Teams) and site visit are scheduled in January 2026.
AvailableRemodeling of portions of the interior and exterior of the light rail training center (LRTC) building. The scope of the phase 2 project is as follows: remodel the east half of the building, including adding additional restrooms, training rooms, exits, and other support spaces, including all architectural, structural, mechanical and electrical work required. Provide and install windows on the south side of the building. Provide finishes to the east half of the building. Remodel select areas of the west half of the building as indicated on the drawings. Repair the exterior façade and paint. Add parking lot on the west side of the site and update stormwater access. Add the parking along the road between the balloon tracks. Add/modify sidewalks and paved areas around the existing building. Update parking in front of the building for accessibility. Extend and expand the existing HVAC system including ductwork and adding an additional mechanical unit. Extend power, data, and life safety systems into the remodeled areas of the building. Contaminated soil removal in the area of the parking lot as defined in the attached limited phase II drilling investigation.
Posted Date
Jul 15, 2025
Due Date
Jan 29, 2026
Release: Jul 15, 2025
The City of Fontana is soliciting bids for the City Hall Renovation Project - Phase II, which involves the demolition of the existing City Hall and construction of a new ~44,451 SF building, along with a multi-level exterior plaza and 111 new ground-level parking spaces. This project also includes remodeling a portion of the Development Services Offices (DSO) building and constructing a pedestrian bridge, with phased demolition and construction to minimize disruption. Bidders must possess a Class A contractor's license (or equivalent), provide 10% bid and 100% payment/performance bonds, and attend a mandatory pre-bid meeting on January 14, 2026.
Posted Date
Dec 23, 2025
Due Date
Jan 29, 2026
Release: Dec 23, 2025
Close: Jan 29, 2026
The City of Fontana is soliciting bids for the City Hall Renovation Project - Phase II, which involves the demolition of the existing City Hall and construction of a new ~44,451 SF building, along with a multi-level exterior plaza and 111 new ground-level parking spaces. This project also includes remodeling a portion of the Development Services Offices (DSO) building and constructing a pedestrian bridge, with phased demolition and construction to minimize disruption. Bidders must possess a Class A contractor's license (or equivalent), provide 10% bid and 100% payment/performance bonds, and attend a mandatory pre-bid meeting on January 14, 2026.
Architectural services for Phase II of the Fire Training and Safety Building (12142 Joplin Road) in Boise. Requires submission of a Statement of Qualifications via JAGGAER, a supervising architect licensed in Idaho (license number must be provided), and site access is limited to the scheduled pre-bid meeting.
Posted Date
Dec 3, 2025
Due Date
Jan 14, 2026
Release: Dec 3, 2025
Close: Jan 14, 2026
Architectural services for Phase II of the Fire Training and Safety Building (12142 Joplin Road) in Boise. Requires submission of a Statement of Qualifications via JAGGAER, a supervising architect licensed in Idaho (license number must be provided), and site access is limited to the scheduled pre-bid meeting.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 29, 2026
Remodeling of portions of the interior and exterior of the light rail training center (LRTC) building. The scope of the phase 2 project is as follows: remodel the east half of the building, including adding additional restrooms, training rooms, exits, and other support spaces, including all architectural, structural, mechanical and electrical work required. Provide and install windows on the south side of the building. Provide finishes to the east half of the building. Remodel select areas of the west half of the building as indicated on the drawings. Repair the exterior façade and paint. Add parking lot on the west side of the site and update stormwater access. Add the parking along the road between the balloon tracks. Add/modify sidewalks and paved areas around the existing building. Update parking in front of the building for accessibility. Extend and expand the existing HVAC system including ductwork and adding an additional mechanical unit. Extend power, data, and life safety systems into the remodeled areas of the building. Contaminated soil removal in the area of the parking lot as defined in the attached limited phase II drilling investigation.
Available