Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work shall include, but not be limited to demolition of the existing stations, by-pass pumping, installation of new pumps and motors, valve boxes, mechanical piping, electrical and control equipment installation. Construction also include dewatering, MOT’s, site preparation, complying with permit conditions, testing and site restoration work for a complete and operating system as well as all appurtenances and other incidentals as indicated by the drawings and specifications for the fulfillment of the Contract in accordance with the Contract Documents.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Lift Station #13 Rehabilitation project. Bidder shall furnish all labor, equipment and materials to demolish the existing submersible wastewater lift station including pumps, wet well top slab, discharge piping, controls, emergency generator system and fuel system as applicable. The existing wet well below the top slab will remain. The project will include, but not be limited to, the rehabilitation of the existing wet well, installation of submersible wastewater pumps and accessories, access hatches, discharge piping, flow meter vault, gravity sewer, valves, and fittings, macerator assembly, control system, SCADA, electrical service, emergency generator with integral fuel tank, fencing, water service, start-up services, training, site restoration, associated roadway and right-of-way restoration, and all other appurtenances necessary for a complete and accepted project. Construction of this project will require close coordination with the Owner and Engineer.
Posted Date
Oct 30, 2025
Due Date
Dec 15, 2025
Release: Oct 30, 2025
Premium
Access the largest public sector contact database
Close: Dec 15, 2025
The Lift Station #13 Rehabilitation project. Bidder shall furnish all labor, equipment and materials to demolish the existing submersible wastewater lift station including pumps, wet well top slab, discharge piping, controls, emergency generator system and fuel system as applicable. The existing wet well below the top slab will remain. The project will include, but not be limited to, the rehabilitation of the existing wet well, installation of submersible wastewater pumps and accessories, access hatches, discharge piping, flow meter vault, gravity sewer, valves, and fittings, macerator assembly, control system, SCADA, electrical service, emergency generator with integral fuel tank, fencing, water service, start-up services, training, site restoration, associated roadway and right-of-way restoration, and all other appurtenances necessary for a complete and accepted project. Construction of this project will require close coordination with the Owner and Engineer.
AvailableRehabilitate three wet wells (includes one slab and lid, two pump guide rails, replacement of bolts and anchors, installation of one 60" safety grate and one jib crane hoist, removal and replacement of discharge piping, and diversion by-pass pumping). Surface preparation (sand and grout) and zebron application to tree wet wells. Update four vale vaults. Meter vaults upddates. Updated existing diversion vault sluice gates to 316 stainless steel sluice gates. Construction of one standard manhole and one modified drop manhole for diversion. Installation of approx. 101 FT of 8" PVC sanitary sewer piping and 120 FT of 4" PVC SAS force main. Site grading for positive drainage and gravel install. Removal and replacement of one standard manhole and new diversion manhole.
Posted Date
Oct 5, 2025
Due Date
Dec 18, 2025
Release: Oct 5, 2025
Close: Dec 18, 2025
Rehabilitate three wet wells (includes one slab and lid, two pump guide rails, replacement of bolts and anchors, installation of one 60" safety grate and one jib crane hoist, removal and replacement of discharge piping, and diversion by-pass pumping). Surface preparation (sand and grout) and zebron application to tree wet wells. Update four vale vaults. Meter vaults upddates. Updated existing diversion vault sluice gates to 316 stainless steel sluice gates. Construction of one standard manhole and one modified drop manhole for diversion. Installation of approx. 101 FT of 8" PVC sanitary sewer piping and 120 FT of 4" PVC SAS force main. Site grading for positive drainage and gravel install. Removal and replacement of one standard manhole and new diversion manhole.
AvailableCity of Hallandale Beach ITB for full rehabilitation of Lift Station #13: demolition (except wet well), wet well rehab, installation of submersible wastewater pumps and accessories, access hatches, discharge piping, flow meter vault, gravity sewer, valves, macerator, control system/SCADA, electrical service and emergency generator with fuel tank, fencing, site restoration and related appurtenances. Estimated budget $3,635,000. Federally funded (CDBG‑MIT/HUD) — Davis‑Bacon wage rates, federal procurement/audit requirements (2 C.F.R. Part 200), 365‑day contract; requires Florida certified/registered general contractor, bid bond (5%) and 100% performance/payment bond and other MQRs.
Posted Date
Oct 30, 2025
Due Date
Dec 15, 2025
Release: Oct 30, 2025
Close: Dec 15, 2025
City of Hallandale Beach ITB for full rehabilitation of Lift Station #13: demolition (except wet well), wet well rehab, installation of submersible wastewater pumps and accessories, access hatches, discharge piping, flow meter vault, gravity sewer, valves, macerator, control system/SCADA, electrical service and emergency generator with fuel tank, fencing, site restoration and related appurtenances. Estimated budget $3,635,000. Federally funded (CDBG‑MIT/HUD) — Davis‑Bacon wage rates, federal procurement/audit requirements (2 C.F.R. Part 200), 365‑day contract; requires Florida certified/registered general contractor, bid bond (5%) and 100% performance/payment bond and other MQRs.
AvailableWork includes construction and rehabilitation of seven of the districts sanitary sewer lift stations, includes the demolition of the existing lift station mechanical & electrical components, the installation of new pumps, new discharge piping, valves, and fittings, lining the interior of the existing wet well structure, a new wet well lid and concrete pad, and electrical modifications to make the lift station a complete and operable system.
Posted Date
Nov 28, 2025
Due Date
Jan 8, 2026
Release: Nov 28, 2025
Close: Jan 8, 2026
Work includes construction and rehabilitation of seven of the districts sanitary sewer lift stations, includes the demolition of the existing lift station mechanical & electrical components, the installation of new pumps, new discharge piping, valves, and fittings, lining the interior of the existing wet well structure, a new wet well lid and concrete pad, and electrical modifications to make the lift station a complete and operable system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.