Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Rehabilitate three wet wells (includes one slab and lid, two pump guide rails, replacement of bolts and anchors, installation of one 60" safety grate and one jib crane hoist, removal and replacement of discharge piping, and diversion by-pass pumping). Surface preparation (sand and grout) and zebron application to tree wet wells. Update four vale vaults. Meter vaults upddates. Updated existing diversion vault sluice gates to 316 stainless steel sluice gates. Construction of one standard manhole and one modified drop manhole for diversion. Installation of approx. 101 FT of 8" PVC sanitary sewer piping and 120 FT of 4" PVC SAS force main. Site grading for positive drainage and gravel install. Removal and replacement of one standard manhole and new diversion manhole.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The work shall include, but not be limited to demolition of the existing stations, by-pass pumping, installation of new pumps and motors, valve boxes, mechanical piping, electrical and control equipment installation. Construction also include dewatering, MOT’s, site preparation, complying with permit conditions, testing and site restoration work for a complete and operating system as well as all appurtenances and other incidentals as indicated by the drawings and specifications for the fulfillment of the Contract in accordance with the Contract Documents.
Posted Date
Nov 25, 2025
Due Date
Jan 13, 2026
Release: Nov 25, 2025
Close: Jan 13, 2026
The work shall include, but not be limited to demolition of the existing stations, by-pass pumping, installation of new pumps and motors, valve boxes, mechanical piping, electrical and control equipment installation. Construction also include dewatering, MOT’s, site preparation, complying with permit conditions, testing and site restoration work for a complete and operating system as well as all appurtenances and other incidentals as indicated by the drawings and specifications for the fulfillment of the Contract in accordance with the Contract Documents.
AvailableWork includes lift station 7, 37 coast guard, yacht club rehabilitation and lift station 45 sunlit shores rehabilitation.
Posted Date
Dec 14, 2025
Due Date
Jan 27, 2026
Release: Dec 14, 2025
Close: Jan 27, 2026
Work includes lift station 7, 37 coast guard, yacht club rehabilitation and lift station 45 sunlit shores rehabilitation.
AvailableWork includes construction and rehabilitation of seven of the districts sanitary sewer lift stations, includes the demolition of the existing lift station mechanical & electrical components, the installation of new pumps, new discharge piping, valves, and fittings, lining the interior of the existing wet well structure, a new wet well lid and concrete pad, and electrical modifications to make the lift station a complete and operable system.
Posted Date
Nov 28, 2025
Due Date
Jan 8, 2026
Release: Nov 28, 2025
Close: Jan 8, 2026
Work includes construction and rehabilitation of seven of the districts sanitary sewer lift stations, includes the demolition of the existing lift station mechanical & electrical components, the installation of new pumps, new discharge piping, valves, and fittings, lining the interior of the existing wet well structure, a new wet well lid and concrete pad, and electrical modifications to make the lift station a complete and operable system.
The City of Duluth is soliciting bids for rehabilitation of Lift Station 27, Lift Station 40, and Lift Station 3, covering civil engineering and construction work. Bids are due 2025-12-18 and the posting was listed active as of 2025-11-21.
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
Close: Dec 18, 2025
The City of Duluth is soliciting bids for rehabilitation of Lift Station 27, Lift Station 40, and Lift Station 3, covering civil engineering and construction work. Bids are due 2025-12-18 and the posting was listed active as of 2025-11-21.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis