Retrieving RFP details
Release
Close
Pueblo of Laguna Utility Authority
Rehabilitate three wet wells (includes one slab and lid, two pump guide rails, replacement of bolts and anchors, installation of one 60" safety grate and one jib crane hoist, removal and replacement of discharge piping, and diversion by-pass pumping). Surface preparation (sand and grout) and zebron application to tree wet wells. Update four vale vaults. Meter vaults upddates. Updated existing diversion vault sluice gates to 316 stainless steel sluice gates. Construction of one standard manhole and one modified drop manhole for diversion. Installation of approx. 101 FT of 8" PVC sanitary sewer piping and 120 FT of 4" PVC SAS force main. Site grading for positive drainage and gravel install. Removal and replacement of one standard manhole and new diversion manhole.
City of Clermont
Electrical rehabilitation.
Truckee Meadows Water Authority
Rehabilitation of two underground booster pump stations. Work includes electrical work and pipe work both inside and outside the vault. In addition to the work at hoge 2 bps, an insertion valve is to be installed on a 14" transite main.
City of Pompano Beach
Well rehabilitation and maintenance services.
Release
Oct 05, 2025
Close
Dec 05, 2025