Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Hallandale Beach
City of Hallandale Beach ITB for full rehabilitation of Lift Station #13: demolition (except wet well), wet well rehab, installation of submersible wastewater pumps and accessories, access hatches, discharge piping, flow meter vault, gravity sewer, valves, macerator, control system/SCADA, electrical service and emergency generator with fuel tank, fencing, site restoration and related appurtenances. Estimated budget $3,635,000. Federally funded (CDBG‑MIT/HUD) — Davis‑Bacon wage rates, federal procurement/audit requirements (2 C.F.R. Part 200), 365‑day contract; requires Florida certified/registered general contractor, bid bond (5%) and 100% performance/payment bond and other MQRs.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Hallandale Beach
The Lift Station #13 Rehabilitation project. Bidder shall furnish all labor, equipment and materials to demolish the existing submersible wastewater lift station including pumps, wet well top slab, discharge piping, controls, emergency generator system and fuel system as applicable. The existing wet well below the top slab will remain. The project will include, but not be limited to, the rehabilitation of the existing wet well, installation of submersible wastewater pumps and accessories, access hatches, discharge piping, flow meter vault, gravity sewer, valves, and fittings, macerator assembly, control system, SCADA, electrical service, emergency generator with integral fuel tank, fencing, water service, start-up services, training, site restoration, associated roadway and right-of-way restoration, and all other appurtenances necessary for a complete and accepted project. Construction of this project will require close coordination with the Owner and Engineer.
Posted Date
Oct 30, 2025
Due Date
Dec 15, 2025
Release: Oct 30, 2025
City of Hallandale Beach
Close:
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
The Lift Station #13 Rehabilitation project. Bidder shall furnish all labor, equipment and materials to demolish the existing submersible wastewater lift station including pumps, wet well top slab, discharge piping, controls, emergency generator system and fuel system as applicable. The existing wet well below the top slab will remain. The project will include, but not be limited to, the rehabilitation of the existing wet well, installation of submersible wastewater pumps and accessories, access hatches, discharge piping, flow meter vault, gravity sewer, valves, and fittings, macerator assembly, control system, SCADA, electrical service, emergency generator with integral fuel tank, fencing, water service, start-up services, training, site restoration, associated roadway and right-of-way restoration, and all other appurtenances necessary for a complete and accepted project. Construction of this project will require close coordination with the Owner and Engineer.
AvailableCity of Duluth
The City of Duluth is soliciting bids for rehabilitation of Lift Station 27, Lift Station 40, and Lift Station 3, covering civil engineering and construction work. Bids are due 2025-12-18 and the posting was listed active as of 2025-11-21.
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
City of Duluth
Close: Dec 18, 2025
The City of Duluth is soliciting bids for rehabilitation of Lift Station 27, Lift Station 40, and Lift Station 3, covering civil engineering and construction work. Bids are due 2025-12-18 and the posting was listed active as of 2025-11-21.
AvailableCity of La Harpe
Remove and replace three (3) vacuum prime pump station including controls, piping, and appurtenances. Corrosion protective coating of existing wet wells. Install new 5' diameter wet well and vacuum prime lift station. Replace two (2) submersible pumps, controls, and electrical at primary lift station.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
City of La Harpe
Close: Dec 16, 2025
Remove and replace three (3) vacuum prime pump station including controls, piping, and appurtenances. Corrosion protective coating of existing wet wells. Install new 5' diameter wet well and vacuum prime lift station. Replace two (2) submersible pumps, controls, and electrical at primary lift station.
AvailableCedar Key Water And Sewer District
Work includes construction and rehabilitation of seven of the districts sanitary sewer lift stations, includes the demolition of the existing lift station mechanical & electrical components, the installation of new pumps, new discharge piping, valves, and fittings, lining the interior of the existing wet well structure, a new wet well lid and concrete pad, and electrical modifications to make the lift station a complete and operable system.
Posted Date
Nov 28, 2025
Due Date
Jan 8, 2026
Release: Nov 28, 2025
Cedar Key Water And Sewer District
Close: Jan 8, 2026
Work includes construction and rehabilitation of seven of the districts sanitary sewer lift stations, includes the demolition of the existing lift station mechanical & electrical components, the installation of new pumps, new discharge piping, valves, and fittings, lining the interior of the existing wet well structure, a new wet well lid and concrete pad, and electrical modifications to make the lift station a complete and operable system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →