Colwyn Borough (Delaware County, PA) issued an IFB titled "Police Station Renovations - Phase 1" for renovation work at the Borough police station to include structural improvements, interior upgrades, and other work to bring the facility into compliance with modern standards. The solicitation requires compliance with Pennsylvania prevailing wage rules and bidder bonding (10% bid security and 100% performance bond), and the work must be completed within 120 consecutive calendar days after Notice to Proceed. The opportunity was posted in July 2026 with a non-mandatory pre-bid conference and a question deadline posted on the buyer portal; bids are due July 30, 2026.
Colwyn Borough (Delaware County, PA) issued an IFB titled "Police Station Renovations - Phase 1" for renovation work at the Borough police station to include structural improvements, interior upgrades, and other work to bring the facility into compliance with modern standards. The solicitation requires compliance with Pennsylvania prevailing wage rules and bidder bonding (10% bid security and 100% performance bond), and the work must be completed within 120 consecutive calendar days after Notice to Proceed. The opportunity was posted in July 2026 with a non-mandatory pre-bid conference and a question deadline posted on the buyer portal; bids are due July 30, 2026.
The Borough of Colwyn is issuing this Invitation for Bid (IFB) for Phase 1 renovations of the Colwyn Borough Police Station located at 222 Spruce Street, Darby, PA 19023 in Delaware County, Pennsylvania. The work includes structural improvements, interior upgrades, and compliance with safety standards, subject to PA Prevailing Wage Requirements. Bidders must provide a 10% bid bond (or equivalent) and the successful bidder must provide a 100% performance bond; the contract must be completed within 120 days of Notice to Proceed.
The Borough of Colwyn is issuing this Invitation for Bid (IFB) for Phase 1 renovations of the Colwyn Borough Police Station located at 222 Spruce Street, Darby, PA 19023 in Delaware County, Pennsylvania. The work includes structural improvements, interior upgrades, and compliance with safety standards, subject to PA Prevailing Wage Requirements. Bidders must provide a 10% bid bond (or equivalent) and the successful bidder must provide a 100% performance bond; the contract must be completed within 120 days of Notice to Proceed.
Project consists of lift station 1-9 replacement. Work includes approx 1 LS piping wet well and force main; 1 LS electrical and controls; 1 LS erosion and sedimentation control.
Project consists of lift station 1-9 replacement. Work includes approx 1 LS piping wet well and force main; 1 LS electrical and controls; 1 LS erosion and sedimentation control.
Work consist of construction of site-built cast-in-place lift station concrete structure and associated masonry, site excavation, dewatering, shoring, forming, grubbing, grading, paving, and restoration pertinent, installation of mechanical piping, valving, force mains, to and from the lift station, installation of mechanical piping, valving, force mains internal to the lift station, installation of fusion welding (HDPE), electrical work and connections to the lift station, and all internal electrical components of the lift station, installation and integration of communications, electrical controls, SCADA devices internal to the lift station, and external from the lift station. See attached file.
Work consist of construction of site-built cast-in-place lift station concrete structure and associated masonry, site excavation, dewatering, shoring, forming, grubbing, grading, paving, and restoration pertinent, installation of mechanical piping, valving, force mains, to and from the lift station, installation of mechanical piping, valving, force mains internal to the lift station, installation of fusion welding (HDPE), electrical work and connections to the lift station, and all internal electrical components of the lift station, installation and integration of communications, electrical controls, SCADA devices internal to the lift station, and external from the lift station. See attached file.