Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes twelve 8" -10" PVC sanitary sewer main repairs and 24 service lateral connection renewals; 394 LF of 8" -10" sewer main by open cut replacement and three service lateral open cut replacements; 2,293 LF of 8" -10" main rehabilitation with cured-in-place (CIPP) lining, 16 CIPP liner end seals, 29 service reinstatements, and twelve 4" -6" service lateral rehabilitations with CIPP lining; eight service lateral CIPP lining without main lining; 989 LF of 8" -10" sanitary sewer mainline replacement by pipe bursting method and 13 service lateral reconnections; miscellaneous manhole improvements including three manholes needing joint and connection sealings, one invert/bench replacement, and one invert and drop cleaning; 906 LF for heavy main line cleaning and CTV inspection; raising 44 manhole frame and covers; and one manhole replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of construction and installation services for Sanitary Sewer System Improvements, including video inspection, CIPP, pipebursting, and manhole rehabilitation, and for Wastewater Treatment Facility Improvements, encompassing mechanical and biofiltration systems, UV disinfection, sludge de-watering, lift station rehabilitation, generator, electrical controls, and sludge retention basin construction.
Posted Date
Dec 30, 2025
Due Date
Jan 29, 2026
Release: Dec 30, 2025
Close: Jan 29, 2026
Procurement of construction and installation services for Sanitary Sewer System Improvements, including video inspection, CIPP, pipebursting, and manhole rehabilitation, and for Wastewater Treatment Facility Improvements, encompassing mechanical and biofiltration systems, UV disinfection, sludge de-watering, lift station rehabilitation, generator, electrical controls, and sludge retention basin construction.
Constructing new wastewater lift station, new sanitary sewer force main, alteration of wastewater treatment lagoons, modifications to wastewater collection system, and miscellaneous other work.
Posted Date
Jan 22, 2026
Due Date
Feb 12, 2026
Release: Jan 22, 2026
Close: Feb 12, 2026
Constructing new wastewater lift station, new sanitary sewer force main, alteration of wastewater treatment lagoons, modifications to wastewater collection system, and miscellaneous other work.
AvailableProcurement of construction services for Sanitary Sewer System Improvements and Wastewater Treatment Facility Improvements.
Posted Date
Dec 30, 2025
Due Date
Jan 29, 2026
Release: Dec 30, 2025
Close: Jan 29, 2026
Procurement of construction services for Sanitary Sewer System Improvements and Wastewater Treatment Facility Improvements.
Procurement for two contracts: Sanitary Sewer System Improvements (Phase I: investigation including video inspection and manhole work; Phase II: construction including CIPP, pipebursting, and manhole rehabilitation) and Wastewater Treatment Facility Improvements (installation of mechanical micro bar screen, biofiltration, UV disinfection, sludge de-watering, lift station rehabilitation, stationary generator, electrical & control improvements, and sludge retention basin construction).
Posted Date
Dec 30, 2025
Due Date
Jan 29, 2026
Release: Dec 30, 2025
Close: Jan 29, 2026
Procurement for two contracts: Sanitary Sewer System Improvements (Phase I: investigation including video inspection and manhole work; Phase II: construction including CIPP, pipebursting, and manhole rehabilitation) and Wastewater Treatment Facility Improvements (installation of mechanical micro bar screen, biofiltration, UV disinfection, sludge de-watering, lift station rehabilitation, stationary generator, electrical & control improvements, and sludge retention basin construction).
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis