Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD. The airport is seeking a firm to design and build a solution to replace portions of the HVAC plant, which includes the cooling tower and boiler. The design and installation should be phased so that affected areas of the terminal are still served properly, depending on heating and cooling seasons. It is the intent to hire an experienced Design-Builder who will assist the airport's engineering staff in implementing the Terminal HVAC Equipment Replacement - Boiler Room 1 based on applicable engineering standards and the airport's vital role in its local community. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project consists of construction of an aviation fuel facility that includes five 40,000- gal. fuel horizontal aboveground storage tanks (asts), with space for three future 40,000-gal. horizontal asts, one 12,000-gal. and one 6,000 gal. horizontal ast and the construction of a control building. The project includes grading, drainage, electrical, paving, fencing, structural, architectural, plumbing, and mechanical work. See outside link.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Close: Dec 18, 2025
Project consists of construction of an aviation fuel facility that includes five 40,000- gal. fuel horizontal aboveground storage tanks (asts), with space for three future 40,000-gal. horizontal asts, one 12,000-gal. and one 6,000 gal. horizontal ast and the construction of a control building. The project includes grading, drainage, electrical, paving, fencing, structural, architectural, plumbing, and mechanical work. See outside link.
AvailableWinnebago County is requesting sealed bids to replace the Wittman Airport Tower chiller, providing all labor, equipment, and materials required for the replacement. Bidders must submit electronically through the County's OpenGov Procurement portal, provide required insurance and bonding (including a 5% bid bond), and attend a mandatory pre-bid meeting. Questions are due November 25, 2025, and sealed bids are due December 18, 2025 at 3:00 PM Central Time.
Posted Date
Nov 5, 2025
Due Date
Dec 18, 2025
Release: Nov 5, 2025
Close: Dec 18, 2025
Winnebago County is requesting sealed bids to replace the Wittman Airport Tower chiller, providing all labor, equipment, and materials required for the replacement. Bidders must submit electronically through the County's OpenGov Procurement portal, provide required insurance and bonding (including a 5% bid bond), and attend a mandatory pre-bid meeting. Questions are due November 25, 2025, and sealed bids are due December 18, 2025 at 3:00 PM Central Time.
Project consists of a central plant replacement at Elementary School. The existing gas-fired hot water boilers and chiller will be replaced and the existing piping will be reworked to support these replacements. The electrical scope is also limited to supporting these replacements.
Posted Date
Nov 24, 2025
Due Date
Dec 12, 2025
Release: Nov 24, 2025
Close: Dec 12, 2025
Project consists of a central plant replacement at Elementary School. The existing gas-fired hot water boilers and chiller will be replaced and the existing piping will be reworked to support these replacements. The electrical scope is also limited to supporting these replacements.
State DOC seeks A/E professional services for HVAC/chiller/kitchen boiler replacement at Headquarters: replace 4 AHUs and 51 terminal units, associated med/low-pressure ductwork, air devices, dampers, new electrical/conduit/wiring, and control upgrades tied to the main server. Scope includes full design (civil, structural, mechanical, plumbing, electrical, fire protection), permitting, cost estimating, construction administration, inspections, and closeout. Anticipated construction cost $3,000,000–$4,000,000. Submittal requirements include Standard Form 330, primary contact, SC residency certification, and required licensure.
Posted Date
Dec 1, 2025
Due Date
Jan 16, 2026
Release: Dec 1, 2025
Close: Jan 16, 2026
State DOC seeks A/E professional services for HVAC/chiller/kitchen boiler replacement at Headquarters: replace 4 AHUs and 51 terminal units, associated med/low-pressure ductwork, air devices, dampers, new electrical/conduit/wiring, and control upgrades tied to the main server. Scope includes full design (civil, structural, mechanical, plumbing, electrical, fire protection), permitting, cost estimating, construction administration, inspections, and closeout. Anticipated construction cost $3,000,000–$4,000,000. Submittal requirements include Standard Form 330, primary contact, SC residency certification, and required licensure.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis