City of Lehi
Lehi City seeks a qualified contractor for the construction of the Skye substation, interconnecting with a 138 kV PacifiCorp transmission line. The project includes site preparation, equipment installation, and testing for a complete and functional substation.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Lehi
Lehi City Power seeks a supplier to design, fabricate, inspect, test, deliver, dress, and fill two three-phase power transformers for the Carter Substation in Lehi, Utah. The transformers are to be 138-12.47kV with a 13.2kV nominal low voltage.
Posted Date
-
Due Date
Dec 11, 2025
City of Lehi
Close: Dec 11, 2025
Lehi City Power seeks a supplier to design, fabricate, inspect, test, deliver, dress, and fill two three-phase power transformers for the Carter Substation in Lehi, Utah. The transformers are to be 138-12.47kV with a 13.2kV nominal low voltage.
AvailableMaryland Transit Administration
This Contract is for the replacement of 26 existing prefabricated traction power substations. The replacement work includes removal of the existing prefabricated type substation enclosures, and design, fabrication, factory testing, delivery, installation, field testing acceptance testing and commissioning for new 2 MW prefabricated-type traction power substations. The work also includes the addition of 750 Vdc pad-mounted load-break disconnect switches and modifications to existing 750 Vdc duct bank and cable systems to interface the new substations and load-break switches with the existing 750 Vdc power distribution systems at all 28 prefabricated Substation locations.
Posted Date
Mar 31, 2025
Due Date
Dec 10, 2025
Release: Mar 31, 2025
Maryland Transit Administration
Close: Dec 10, 2025
This Contract is for the replacement of 26 existing prefabricated traction power substations. The replacement work includes removal of the existing prefabricated type substation enclosures, and design, fabrication, factory testing, delivery, installation, field testing acceptance testing and commissioning for new 2 MW prefabricated-type traction power substations. The work also includes the addition of 750 Vdc pad-mounted load-break disconnect switches and modifications to existing 750 Vdc duct bank and cable systems to interface the new substations and load-break switches with the existing 750 Vdc power distribution systems at all 28 prefabricated Substation locations.
AvailableJEA
Provide construction services for JEAs Miller Solar Substation project. The work consists of installing a new 230kV, 3-element ring bus. A prefabricated control enclosure, which will contain preassembled relay panels, and will be installed at site by a third-party vendor described herein (the "Work"). Mobilization, Site Surveying and establish baselines Site Preparation Receive and offload substation packager materials, Install foundations for all structures and equipment, Install ground grid, ground rods, and equipment ground tails, Install conduits/cable trenches, Backfill and compact site as necessary, Install substation rock, Install site access roads, Install security fencing and gates, Transport JEA provided materials and equipment from JEA storeroom, Install 230kV structures, bus, and equipment, Install grounds to structures and equipment, Finish conduit installation, pull cables, and terminate at yard equipment and inside the control house relay equipment Site Clean-up, sodding/seeding and disposal of debris.
Posted Date
Nov 6, 2025
Due Date
Dec 9, 2025
Release: Nov 6, 2025
JEA
Close: Dec 9, 2025
Provide construction services for JEAs Miller Solar Substation project. The work consists of installing a new 230kV, 3-element ring bus. A prefabricated control enclosure, which will contain preassembled relay panels, and will be installed at site by a third-party vendor described herein (the "Work"). Mobilization, Site Surveying and establish baselines Site Preparation Receive and offload substation packager materials, Install foundations for all structures and equipment, Install ground grid, ground rods, and equipment ground tails, Install conduits/cable trenches, Backfill and compact site as necessary, Install substation rock, Install site access roads, Install security fencing and gates, Transport JEA provided materials and equipment from JEA storeroom, Install 230kV structures, bus, and equipment, Install grounds to structures and equipment, Finish conduit installation, pull cables, and terminate at yard equipment and inside the control house relay equipment Site Clean-up, sodding/seeding and disposal of debris.
AvailableCity of Chapman
Work includes construction of substation.
Posted Date
Nov 19, 2025
Due Date
Dec 19, 2025
Release: Nov 19, 2025
City of Chapman
Close: Dec 19, 2025
Work includes construction of substation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis