Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 LS site prep & mobilization; 11,580 SF 6' concrete walk; 30 SF concrete pad at stone bench; 3 EA stone bench; 1 LS dock at lake; 1 LS earthwork required for walk at lake; 12 LF culvert crossing at walk; 1 LS electrical service (including meter, rack, panel, grounding, disconnect, etc. ) - complete in place; 1 LS irrigation pump & electrical - complete in place; 1 LS lake fountain & electrical - complete in place; 5 EA natchez crape myrtle - 30 gal; 62,261 sf fine grade & hydromulch; 7,339 SF fine grade & sod; 1 LS irrigation - complete in place. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide construction of phase 2 detention to serve legacy.
Posted Date
Dec 18, 2025
Due Date
Jan 6, 2026
Release: Dec 18, 2025
Close: Jan 6, 2026
Provide construction of phase 2 detention to serve legacy.
AvailableConstruction contract for Cherry Hill Water System Phase I & II water line improvements — turnkey water main installation requiring a firm-fixed-price general contractor to provide all supervision, labor, materials, equipment, tools, and installation per the project manual; Virginia SCC registration and Proof of Authority to Transact Business in Virginia required.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Construction contract for Cherry Hill Water System Phase I & II water line improvements — turnkey water main installation requiring a firm-fixed-price general contractor to provide all supervision, labor, materials, equipment, tools, and installation per the project manual; Virginia SCC registration and Proof of Authority to Transact Business in Virginia required.
The Iberia Parish Government issued a solicitation for the 2025 Road Improvements - Phase 1 - Project B to perform pavement milling, base reconstruction, asphalt and concrete paving, drainage work, and pavement markings across several roads in Iberia Parish. Contractors must be licensed in Louisiana for highway, street, and bridge construction and provide a 5% bid guarantee. Sealed bids are due electronically or in person by 10:00 a.m. on January 16, 2026, with a non‑mandatory pre‑bid conference on January 6, 2026.
Posted Date
Dec 17, 2025
Due Date
Jan 16, 2026
Release: Dec 17, 2025
Close: Jan 16, 2026
The Iberia Parish Government issued a solicitation for the 2025 Road Improvements - Phase 1 - Project B to perform pavement milling, base reconstruction, asphalt and concrete paving, drainage work, and pavement markings across several roads in Iberia Parish. Contractors must be licensed in Louisiana for highway, street, and bridge construction and provide a 5% bid guarantee. Sealed bids are due electronically or in person by 10:00 a.m. on January 16, 2026, with a non‑mandatory pre‑bid conference on January 6, 2026.
Work includes New Detention Pond and drainage channel grading, approximately 250 LF of new Limestone Block Retaining Wall, Concrete and Stone Rip Rap, approximately 180 LF of 24" RCP storm sewer, three (3) 4'x4' Precast Concrete Junction Box, Concrete Headwall, Precast concrete 6:1 safety end treatment, SWPPP installations and traffic control.
Posted Date
Dec 29, 2025
Due Date
Jan 27, 2026
Release: Dec 29, 2025
Close: Jan 27, 2026
Work includes New Detention Pond and drainage channel grading, approximately 250 LF of new Limestone Block Retaining Wall, Concrete and Stone Rip Rap, approximately 180 LF of 24" RCP storm sewer, three (3) 4'x4' Precast Concrete Junction Box, Concrete Headwall, Precast concrete 6:1 safety end treatment, SWPPP installations and traffic control.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis