Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work for which proposals are invited consists of the furnishing of all labor, materials and equipment required for the Lebanon Railroad Bridge 2.10 Replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement for replacing the existing bridge deck and associated infrastructure on the Crookton Road at BNSF Railroad Overpass Bridge.
Posted Date
Dec 12, 2025
Due Date
Feb 6, 2026
Release: Dec 12, 2025
Close: Feb 6, 2026
Procurement for replacing the existing bridge deck and associated infrastructure on the Crookton Road at BNSF Railroad Overpass Bridge.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD: Bridge replacement of the superstructure and rehabilitation of the substructure of bridge 10.
Posted Date
Jan 16, 2026
Due Date
Mar 3, 2026
Release: Jan 16, 2026
Close: Mar 3, 2026
DESIGN-BUILD: Bridge replacement of the superstructure and rehabilitation of the substructure of bridge 10.
AvailableWork includes clearing and grubbing, 1,946 SY removal of asphalt pavement, all depths, 2 EA removal of bridge, 670 SY removal of concrete pavement w/ variable depth overlay, 1,210 LF removal of curb & gutter, all types, 312 LF removal of gravity sewer line, all sizes, all types, 1 EA removal of gravity sewer manhole, all sizes, all types, 93 LF removal of guard rail double faced rail including rail & posts, 326 LF removal of guard rail, including rails, posts and terminal ends, 2 EA removal of and replacement of low mast lighting assembly. See attached file.
Posted Date
Oct 6, 2025
Due Date
Feb 3, 2026
Release: Oct 6, 2025
Close: Feb 3, 2026
Work includes clearing and grubbing, 1,946 SY removal of asphalt pavement, all depths, 2 EA removal of bridge, 670 SY removal of concrete pavement w/ variable depth overlay, 1,210 LF removal of curb & gutter, all types, 312 LF removal of gravity sewer line, all sizes, all types, 1 EA removal of gravity sewer manhole, all sizes, all types, 93 LF removal of guard rail double faced rail including rail & posts, 326 LF removal of guard rail, including rails, posts and terminal ends, 2 EA removal of and replacement of low mast lighting assembly. See attached file.
AvailableReplace approx. 1,200 railroad ties.
Posted Date
Jan 7, 2026
Due Date
Feb 9, 2026
Release: Jan 7, 2026
Close: Feb 9, 2026
Replace approx. 1,200 railroad ties.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →