Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 LS of removal of existing bridge; 480 LF of abutment steel H-pile (HP10x42); 200 LF of wing steel H-pile (HP8x36); 2,220 SF of steel sheet pile (70 -7 gauge sheets & 4 type "F" corner sheets at 20'-0); see outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes Traffic Control; 475 LF of Silt Fence; 72 CY of Granular Borrow (Plan Quantity) ; 238 LF of Remove Guardrail; 960 SY of Remove Asphalt Pavement; Clearing and Grubbing ; 757 CY of Roadway Excavation (Plan Quantity); 8" Water Valve; Sewer Manhole Connection; Small Sign Tubular Steel Post Base (B1); 1 EA Remove Bridge. See attached file.
Posted Date
Nov 29, 2025
Due Date
Jan 6, 2026
Release: Nov 29, 2025
Close: Jan 6, 2026
Work includes Traffic Control; 475 LF of Silt Fence; 72 CY of Granular Borrow (Plan Quantity) ; 238 LF of Remove Guardrail; 960 SY of Remove Asphalt Pavement; Clearing and Grubbing ; 757 CY of Roadway Excavation (Plan Quantity); 8" Water Valve; Sewer Manhole Connection; Small Sign Tubular Steel Post Base (B1); 1 EA Remove Bridge. See attached file.
Premium
Access the largest public sector contact database
IDOT is soliciting bids to replace the Warren County CH 7 bridge over Cedar Creek, approximately 3.4 miles northeast of Monmouth. The work includes demolition of the existing structure and construction of a new bridge with structural steel, piles, epoxy-coated reinforcement, deck improvements, riprap/rainfall/erosion control, guardrail, and related roadway work, specified for 50 working days. Bids are due at the January 16, 2026 letting at 12:00 PM CT via IDOT’s e-bidding portal; plans/specifications will be posted by IDOT when available.
Posted Date
Nov 25, 2025
Due Date
Jan 16, 2026
Release: Nov 25, 2025
Close: Jan 16, 2026
IDOT is soliciting bids to replace the Warren County CH 7 bridge over Cedar Creek, approximately 3.4 miles northeast of Monmouth. The work includes demolition of the existing structure and construction of a new bridge with structural steel, piles, epoxy-coated reinforcement, deck improvements, riprap/rainfall/erosion control, guardrail, and related roadway work, specified for 50 working days. Bids are due at the January 16, 2026 letting at 12:00 PM CT via IDOT’s e-bidding portal; plans/specifications will be posted by IDOT when available.
AvailablePedestrian bridge repairs.
Posted Date
Oct 14, 2025
Due Date
Dec 12, 2025
Release: Oct 14, 2025
Close: Dec 12, 2025
Pedestrian bridge repairs.
Provide Bridge Resident Engineer and Inspection Services to assist the University in managing the Fenton Parkway Bridge project.
Posted Date
Nov 5, 2025
Due Date
Dec 17, 2025
Release: Nov 5, 2025
Close: Dec 17, 2025
Provide Bridge Resident Engineer and Inspection Services to assist the University in managing the Fenton Parkway Bridge project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis