Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Sullivan Community Unit School District 300
Lease of a commercial or industrial building located within the geographic boundaries of the district. The facility must meet the following minimum specifications: -3,300 SF of interior space; -existing inclusion or lessor installation of a wash bay for school buses; -existing inclusion or lessor installation of a maintenance pit for school buses. -located within 2 miles of the existing campus.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Belton
This project involves construction of a wash bay building. This work includes pouring a concrete foundation, flooring, and walls, constructing wood walls, a metal catwalk, and bay doors.
Posted Date
-
Due Date
Dec 18, 2025
Release: -
City of Belton
Close: Dec 18, 2025
This project involves construction of a wash bay building. This work includes pouring a concrete foundation, flooring, and walls, constructing wood walls, a metal catwalk, and bay doors.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Belton
The City of Belton is seeking proposals for construction of a wash bay building at its Public Works Facility, including concrete foundation/floors/walls, wood walls, a metal catwalk, and bay doors. A mandatory pre-bid meeting is scheduled and proposal questions should be directed to the listed City engineer.
Posted Date
Oct 30, 2025
Due Date
Dec 18, 2025
Release: Oct 30, 2025
City of Belton
Close: Dec 18, 2025
The City of Belton is seeking proposals for construction of a wash bay building at its Public Works Facility, including concrete foundation/floors/walls, wood walls, a metal catwalk, and bay doors. A mandatory pre-bid meeting is scheduled and proposal questions should be directed to the listed City engineer.
AvailableLower Colorado Regional Office
The current wash rack electric pressure washer and water recycle system.
Posted Date
Nov 21, 2025
Due Date
Dec 5, 2025
Release: Nov 21, 2025
Lower Colorado Regional Office
Close: Dec 5, 2025
The current wash rack electric pressure washer and water recycle system.
AvailableCalifornia Highway Patrol
Bay door maintenance services.
Posted Date
Nov 13, 2025
Due Date
Dec 12, 2025
Release: Nov 13, 2025
California Highway Patrol
Close: Dec 12, 2025
Bay door maintenance services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →