Summary
This project includes all materials, equipment, transportation and labor needed to remove and replace the existing playground equipment at Lawson Elementary. Improvements include the following: Removal of the existing playground equipment and safety mulch, removal of edger materials, underlying granular base, engineering fabric and subdrain, limited pavement removal, fence removal and reinstallation, grading and shaping, installation of subdrains, installation of concrete curb, furnish and installment of new play equipment, installation of installation of concrete base and poured-in-place safety surfacing, installation of overhead shade structure and site restoration.