Summary
The Lawrence Street Multimodal Improvements project includes the following work: full-depth- reclamation (FDR) of travel lanes, add cement treatment to the travel lanes FDR, and pave the travel lanes FDR with HMA asphalt; reshape the FDR of the bike lanes and pave the bike lanes with HMA asphalt; remove existing sidewalk, curb ramps, and curbs; construct concrete curbs, curb ramps, and sidewalk, furnish and install detectable warning surfaces and detectable warning strip; construct stormwater conveyance pipes and catch basins; rain garden planting areas with permeable rock and underdrains; landscape planting (City-furnished plants); pavement markings; permanent signing; and project temporary traffic control, portable message signs, and road-closure detours.