Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
General nature of the work on which bids will be received consists of the addition of an underground bulk fuel tank at the existing generation plant. The work includes replacement of the existing tank monitoring equipment, addition of fuel meters, and the addition of a fuel oil heater. Work will involve modifications to the existing electrical wiring and fuel piping at the generation plant.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide sprinkler system modifications & testing.
Posted Date
Oct 30, 2025
Due Date
Feb 4, 2026
Release: Oct 30, 2025
Close: Feb 4, 2026
Provide sprinkler system modifications & testing.
AvailableCompetitively establish a contract for a next generation tax system.
Posted Date
-
Due Date
Feb 25, 2026
Close: Feb 25, 2026
Competitively establish a contract for a next generation tax system.
AvailableRemove existing secondary manual bar screen. Furnish and install a new 1/8 opening front-cleaning, front-return link driven mechanically cleaned bar screen assembly and any auxiliary equipment or accessories. Furnish and install an interleaving, dual auger washer compactor assembly. A single unit shall provide washing and compacting action on wastewater screenings. The equipment shall be fabricated, assembled, erected, and placed in proper operating condition.
Posted Date
Dec 4, 2025
Due Date
Jan 27, 2026
Release: Dec 4, 2025
Close: Jan 27, 2026
Remove existing secondary manual bar screen. Furnish and install a new 1/8 opening front-cleaning, front-return link driven mechanically cleaned bar screen assembly and any auxiliary equipment or accessories. Furnish and install an interleaving, dual auger washer compactor assembly. A single unit shall provide washing and compacting action on wastewater screenings. The equipment shall be fabricated, assembled, erected, and placed in proper operating condition.
The Project includes the following Work: Replacement of the existing motor control centers at the water treatment plant, replacement of the existing Well No. 3 underground feeders, and upgrades to the existing supervisory control and data acquisition system.
Posted Date
Jan 22, 2026
Due Date
Feb 26, 2026
Release: Jan 22, 2026
Close: Feb 26, 2026
The Project includes the following Work: Replacement of the existing motor control centers at the water treatment plant, replacement of the existing Well No. 3 underground feeders, and upgrades to the existing supervisory control and data acquisition system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis