Ascension Parish School District
School DistrictLA
Posted
Oct 16, 2025
Dec 17, 2026
St. Amant High School Roof Replacement Phase II RFP
Work includes roof replacement.
Description: Replacement of the HVAC systems at Lathrop High School.
SchoolDistrict · MO, US
Adjacent opportunities open for bidding right now.
Ascension Parish School District
School DistrictLA
Posted
Oct 16, 2025
Dec 17, 2026
Work includes roof replacement.
School DistrictNJ
Posted
-
Dec 10, 2026
The work consists of: 1) miscellaneous removal of selected hvac equipment, including blower coil units, fan coil units, rooftop units, air handling units, heat exchangers, relief/intake vents, louvers, exhaust fans, gravity ventilators, sound attenuators, cabinet heaters, fan powered vavs and standard vavs, hot water coils, motorized dampers, curbs and controls, ductwork and piping. 2) installation of new hvac equipment, including blower coil units, fan coil units, rooftop units, air handling units, heat exchangers, relief/intake vents, louvers, exhaust fans, gravity ventilators, sound attenuators, cabinet heaters, motorized dampers, fan powered vavs and standard vavs, hot water coils, roof curbs, doas units and controls.
School DistrictAR
Posted
-
Dec 1, 2026
Provide high school HVAC replacement.
Pickens County School District
School DistrictSC
Posted
Nov 9, 2026
Dec 8, 2026
The Work consists of: Mechanical Systems Upgrades and/or Replacements. Electrical disconnect and reconnect in addition to other items. Fire Alarm modifications. Removal, protection, and replacement of existing Ceiling Tiles and Grids as required to install mechanical systems. Ceiling Tile and Grid replacement. Touch up Painting.
Decision makers connected to this RFP from Lathrop School District R-2.
Solicitation files and supporting documents for this bid.