Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of lakewood elevated water tank. Work consists of furnishing all materials, labor, and all activities required for the design, manufacture, delivery, erection, painting, disinfection, and testing of a welded carbon steel 500,000-gallon elevated single pedestal water storage tank.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Dec 5, 2025
Close: Jan 15, 2026
Elevated water storage tank.
AvailablePremium
Access the largest public sector contact database
The City of Leesburg, Florida, is seeking proposals for an Elevated Water Tank Rehabilitation Project. This invitation for bids (IFB 250701) was posted on December 1, 2025, with bids due by January 14, 2026.
Posted Date
Dec 1, 2025
Due Date
Jan 14, 2026
Release: Dec 1, 2025
Close: Jan 14, 2026
The City of Leesburg, Florida, is seeking proposals for an Elevated Water Tank Rehabilitation Project. This invitation for bids (IFB 250701) was posted on December 1, 2025, with bids due by January 14, 2026.
AvailableWork includes construction of a 2,000,000 gal composite or steel elevated water storage tank (EWST) and associated site improvements, grading, concrete, paving, maintenance of traffic, erosion and sediment control, electrical, instrumentation, and approx. 2,800 LF of 16" dia ductile iron water mains.
Posted Date
Dec 3, 2025
Due Date
Jan 20, 2026
Release: Dec 3, 2025
Close: Jan 20, 2026
Work includes construction of a 2,000,000 gal composite or steel elevated water storage tank (EWST) and associated site improvements, grading, concrete, paving, maintenance of traffic, erosion and sediment control, electrical, instrumentation, and approx. 2,800 LF of 16" dia ductile iron water mains.
AvailableWork includes construction of a 0.75 MG elevated water storage tank of the spheroid design; site improvements including: elevated storage tank; tank foundation; buried and above grade piping and valves; entrance driveway; site grading; retaining wall; structural work; electrical work; instrumentation and SCADA integration.
Posted Date
Nov 19, 2025
Due Date
Jan 9, 2026
Release: Nov 19, 2025
Close: Jan 9, 2026
Work includes construction of a 0.75 MG elevated water storage tank of the spheroid design; site improvements including: elevated storage tank; tank foundation; buried and above grade piping and valves; entrance driveway; site grading; retaining wall; structural work; electrical work; instrumentation and SCADA integration.