Summary
Demolition and Removal of Existing Components - Removal of five (5) porcelain toilets, one (1) urinal, two (2) sinks, seven (7) windows, three (3) doors, five (5) stall divider doors, four (4) 4’
fluorescent tube light fixtures, five (5) single light fixtures, one (1) exterior sign/display case, one (1) mirror, five (5) toilet paper roll holders, two (2) roof skylight bubbles. Installation of five (5) toilets – New commercial-grade, vandal-resistant stainless-steel wall mounted toilets are to be installed in the same place as the existing toilets. Repairs to existing water supply are not anticipated but will be the responsibility of the contractor should damage occur. All penetrations are to be sealed to prevent pest and moisture infiltration. All plumbing systems shall be tested at completion to ensure leak-free operation.