Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remove all partitions/stalls, wall finishes as required, fixtures (toilets, urinal, sinks/faucets), accessories, and associated debris. Provide on-site dumpster for demolition and construction. Provide and install (10) recessed LED can lights (5 per restroom) on existing switch legs. Replace all receptacles and switches in current locations. Provide and replace all stop valves to fixtures. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The U.S. Army Corps of Engineers, Kansas City District (Harry S. Truman Dam & Reservoir), seeks contractors to perform roadway and parking lot rehabilitation at Sac Access Roads including HMA replacement, aggregate shoulder installation, pulverization/reclaiming, crack sealing, and related site work. The estimated contract value is $100,000–$250,000 with a period of performance of approximately 270 calendar days from NTP; bid and performance bonds are required. The solicitation is full and open, NAICS 237310, and includes a planned site visit and downloadable solicitation documents and drawings on the official SAM.gov posting.
Posted Date
Jan 8, 2026
Due Date
Feb 9, 2026
Release: Jan 8, 2026
Close: Feb 9, 2026
The U.S. Army Corps of Engineers, Kansas City District (Harry S. Truman Dam & Reservoir), seeks contractors to perform roadway and parking lot rehabilitation at Sac Access Roads including HMA replacement, aggregate shoulder installation, pulverization/reclaiming, crack sealing, and related site work. The estimated contract value is $100,000–$250,000 with a period of performance of approximately 270 calendar days from NTP; bid and performance bonds are required. The solicitation is full and open, NAICS 237310, and includes a planned site visit and downloadable solicitation documents and drawings on the official SAM.gov posting.
AvailableRenovation of the existing restrooms on all three floors of mike hughes hall (vcu brandcenter), including selective demolition work as required. On levels 1 and 2, the traditional men's/women's restroom layouts will largely remain intact, whereas on the basement level, the traditional men s women s restroom layouts will be fully reconfigured in order to accommodate all-gender restrooms.
Posted Date
Dec 19, 2025
Due Date
Jan 26, 2026
Release: Dec 19, 2025
Close: Jan 26, 2026
Renovation of the existing restrooms on all three floors of mike hughes hall (vcu brandcenter), including selective demolition work as required. On levels 1 and 2, the traditional men's/women's restroom layouts will largely remain intact, whereas on the basement level, the traditional men s women s restroom layouts will be fully reconfigured in order to accommodate all-gender restrooms.
Work includes to develop one or more landfill gas to energy (lfgte) or other beneficial use project(s) utilizing landfill gas (lfg).
Posted Date
Nov 24, 2025
Due Date
Feb 25, 2026
Release: Nov 24, 2025
Close: Feb 25, 2026
Work includes to develop one or more landfill gas to energy (lfgte) or other beneficial use project(s) utilizing landfill gas (lfg).
AvailableImprovement project for nature preserve park phase 1. The project involves: 7' wide ADA stone loop trail, asphalt trail, demo and replacement of pedestrian bridge, pedestrian boardwalk w/ platform, pavilion w/ concrete pad & picnic tables, nature-based play area, bike rack, trash receptacles, benches, signage, landscape improvements, parking lot demo, lawn restoration and e&s controls.
Posted Date
Dec 22, 2025
Due Date
Jan 27, 2026
Release: Dec 22, 2025
Close: Jan 27, 2026
Improvement project for nature preserve park phase 1. The project involves: 7' wide ADA stone loop trail, asphalt trail, demo and replacement of pedestrian bridge, pedestrian boardwalk w/ platform, pavilion w/ concrete pad & picnic tables, nature-based play area, bike rack, trash receptacles, benches, signage, landscape improvements, parking lot demo, lawn restoration and e&s controls.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis